Rafael Pastor

Orcid: 0000-0002-6188-4458

Affiliations:
  • Technical University of Catalonia, Barcelona, Spain


According to our database1, Rafael Pastor authored at least 54 papers between 2002 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times.
Comput. Oper. Res., September, 2023

MILP model for the mid-term production planning in a chemical company with non-constant consumption of raw materials. An industrial application.
Comput. Chem. Eng., September, 2023

2022
Methodology for integrated multicriteria decision-making with uncertainty: Extending the compromise ranking method for uncertain evaluation of alternatives.
Fuzzy Sets Syst., 2022

A multi-objective optimization approach for the design of stand-alone electrification systems based on renewable energies.
Expert Syst. Appl., 2022

Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints.
Eur. J. Oper. Res., 2022

Multicriteria analysis of renewable-based electrification projects in developing countries.
Ann. Oper. Res., 2022

2020
A survey of the parallel assembly lines balancing problem.
Comput. Oper. Res., 2020

2019
A multistage graph-based procedure for solving a just-in-time flexible job-shop scheduling problem with machine and time-dependent processing costs.
J. Oper. Res. Soc., 2019

2018
Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints.
Eur. J. Oper. Res., 2018

2017
The multi-objective assembly line worker integration and balancing problem of type-2.
Comput. Oper. Res., 2017

2016
Hybrid metaheuristics for the Accessibility Windows Assembly Line Balancing Problem Level 2 (AWALBP-L2).
Eur. J. Oper. Res., 2016

MILP-based heuristics for the design of rural community electrification projects.
Comput. Oper. Res., 2016

2015
Metaheuristic procedures for the lexicographic bottleneck assembly line balancing problem.
J. Oper. Res. Soc., 2015

Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1).
Comput. Oper. Res., 2015

Technical Note: Relating to the Parameter Values Given by Nelder and Mead in their Algorithm.
Comput. J., 2015

2014
Combining matheuristics and MILP to solve the accessibility windows assembly line balancing problem level 2 (AWALBP-L2).
Comput. Oper. Res., 2014

2013
A branch and bound algorithm for the response time variability problem.
J. Sched., 2013

Technical note: a systematic procedure based on CALIBRA and the Nelder & Mead algorithm for fine-tuning metaheuristics.
J. Oper. Res. Soc., 2013

A MILP model to design hybrid wind-photovoltaic isolated rural electrification projects in developing countries.
Eur. J. Oper. Res., 2013

Minimising maximum response time.
Comput. Oper. Res., 2013

Erratum to "A solution procedure for type E simple assembly line balancing problem".
Comput. Ind. Eng., 2013

2011
Designing greedy algorithms for the flow-shop problem by means of Empirically Adjusted Greedy Heuristics (EAGH).
J. Oper. Res. Soc., 2011

Optimizing microwind rural electrification projects. A case study in Peru.
J. Glob. Optim., 2011

Hyper-heuristic approaches for the response time variability problem.
Eur. J. Oper. Res., 2011

Planning working time accounts under demand uncertainty.
Comput. Oper. Res., 2011

2010
Capacity planning with working time accounts in services.
J. Oper. Res. Soc., 2010

Fine-tuning a parametric Clarke and Wright heuristic by means of EAGH (empirically adjusted greedy heuristics).
J. Oper. Res. Soc., 2010

Solving the response time variability problem by means of the cross-entropy method.
Int. J. Manuf. Technol. Manag., 2010

Solving the response time variability problem by means of a psychoclonal approach.
J. Heuristics, 2010

Corrigendum to "Balancing and scheduling tasks in assembly lines with sequence-dependent setup" [European Journal of Operational Research 187 (2008) 1212-1223].
Eur. J. Oper. Res., 2010

An entropy-based measurement of working time flexibility.
Eur. J. Oper. Res., 2010

Solving the response time variability problem by means of a genetic algorithm.
Eur. J. Oper. Res., 2010

Mathematical programming modeling of the Response Time Variability Problem.
Eur. J. Oper. Res., 2010

2009
An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem.
J. Heuristics, 2009

Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals.
Eur. J. Oper. Res., 2009

Planning production using mathematical programming: The case of a woodturning company.
Comput. Oper. Res., 2009

Introducing dynamic diversity into a discrete particle swarm optimization.
Comput. Oper. Res., 2009

A Parametric Multi-start Algorithm for Solving the Response Time Variability Problem.
Proceedings of the Large-Scale Scientific Computing, 7th International Conference, 2009

2008
A proposal for a hybrid meta-strategy for combinatorial optimization problems.
J. Heuristics, 2008

Selecting and adapting weekly work schedules with working time accounts: A case of a retail clothing chain.
Eur. J. Oper. Res., 2008

Balancing and scheduling tasks in assembly lines with sequence-dependent setup times.
Eur. J. Oper. Res., 2008

Solving the Response Time Variability Problem by means of Multi-start and GRASP metaheuristics.
Proceedings of the Artificial Intelligence Research and Development, 2008

2007
Using a MILP model to establish a framework for an annualised hours agreement.
Eur. J. Oper. Res., 2007

Planning annualised hours with a finite set of weekly working hours and cross-trained workers.
Eur. J. Oper. Res., 2007

Planning production and working time within an annualised hours scheme framework.
Ann. Oper. Res., 2007

Evaluating Optimization Models to Solve SALBP.
Proceedings of the Computational Science and Its Applications, 2007

2006
The ASALB Problem with Processing Alternatives Involving Different Tasks: Definition, Formalization and Resolution.
Proceedings of the Computational Science and Its Applications, 2006

Solving the Response Time Variability Problem by means of metaheuristics.
Proceedings of the Artificial Intelligence Research and Development, 2006

Heuristic Methods to Solve the Alternative Subgraphs Assembly Line Balancing Problem.
Proceedings of the 2006 IEEE International Conference on Automation Science and Engineering, 2006

2005
Multi-objective allocation of multi-function workers with lower bounded capacity.
J. Oper. Res. Soc., 2005

2004
Characteristics and classification of the annualised working hours planning problems.
Int. J. Serv. Technol. Manag., 2004

Planning Annualised Hours with a Finite Set of Weekly Working Hours and Joint Holidays.
Ann. Oper. Res., 2004

2002
Using MILP to plan annualised working hours.
J. Oper. Res. Soc., 2002

Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion.
J. Oper. Res. Soc., 2002


  Loading...