Ming Lu

Orcid: 0000-0002-8191-8627

Affiliations:
  • University of Alberta, Department of Civil and Environmental Engineering, Edmonton, AB, Canada


According to our database1, Ming Lu authored at least 15 papers between 2012 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2022
Variance Analysis on Regression Models for Estimating Labor Costs of Prefabricated Components.
J. Comput. Civ. Eng., 2022

2021
Anal Yzing Impact Of Semi-Productive Work Hours In Scheduling and Budgeting Labor-Intensive Projects: Simulation-Based Approach.
Proceedings of the Winter Simulation Conference, 2021

2020
Planning and Scheduling Drainage Infrastructure Maintenance Operations Under Hard and Soft Constraints: A Simulation Study.
Proceedings of the Winter Simulation Conference, 2020

2019
Mixed-Integer Linear Programming-Based Sensitivity Analysis in Optimization of Temporary Haul Road Layout Design for Earthmoving Operations.
J. Comput. Civ. Eng., 2019

Classical Planning Model-Based Approach to Automating Construction Planning on Earthwork Projects.
Comput. Aided Civ. Infrastructure Eng., 2019

Simulation-based Approach to Systematic Project Planning and Scheduling at a Bridge Girder Fabrication Shop.
Proceedings of the 2019 Winter Simulation Conference, 2019

2018
Productivity Improvement in Operating Autonomous plants subject to Random breakdowns in Construction.
Proceedings of the 2018 Winter Simulation Conference, 2018

2017
Synthesizing engineering design, material takeoff and simulation-based estimating on a bridge deck reinforcement case.
Proceedings of the 2017 Winter Simulation Conference, 2017

2016
Zero-One Programming Approach to Determine Optimum Resource Supply under Time-Dependent Resource Constraints.
J. Comput. Civ. Eng., 2016

Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry.
Adv. Eng. Informatics, 2016

2015
Virtual Laser Target Board for Alignment Control and Machine Guidance in Tunnel-Boring Operations.
J. Intell. Robotic Syst., 2015

2014
Bi-level project simulation methodology to integrate superintendent and project manager in decision making: shutdown/turnaround applications.
Proceedings of the 2014 Winter Simulation Conference, 2014

BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication.
Proceedings of the 2014 Winter Simulation Conference, 2014

2013
Utilizing simulation derived quantitative formulas for accurate excavator hauler fleet selection.
Proceedings of the Winter Simulations Conference: Simulation Making Decisions in a Complex World, 2013

2012
Simulation of mobile falsework utilization methods in bridge construction.
Proceedings of the Winter Simulation Conference, 2012


  Loading...