A. M. A. Hariri

According to our database1, A. M. A. Hariri authored at least 8 papers between 1983 and 1999.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

1999
Single‐machine scheduling to minimize maximumtardiness with minimum number of tardy jobs.
Ann. Oper. Res., 1999

1998
Branch and bound algorithms for single-machinescheduling with batch set-up times to minimizetotal weighted completion time.
Ann. Oper. Res., 1998

1997
Single machine scheduling with batch set-up times to minimize maximum lateness.
Ann. Oper. Res., 1997

Scheduling a two-stage hybrid flow shop with parallel machines at the first stage.
Ann. Oper. Res., 1997

1995
Single Machine Scheduling to Minimize Total Weighted Late Work.
INFORMS J. Comput., 1995

1992
The <i>M/M/c/N</i> queue with balking and reneging.
Comput. Oper. Res., 1992

1991
Heuristics for scheduling unrelated parallel machines.
Comput. Oper. Res., 1991

1983
An algorithm for single machine sequencing with release dates to minimize total weighted completion time.
Discret. Appl. Math., 1983


  Loading...