Angela Hsiang-Ling Chen

Orcid: 0000-0003-0796-0170

According to our database1, Angela Hsiang-Ling Chen authored at least 16 papers between 2006 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Unravelling commuters' modal splitting behaviour in mass transportation service operation.
Public Transp., October, 2023

2017
Using discrete Differential Evolution and entropy to solve the MRCPSP.
Proceedings of the 2017 IEEE Congress on Evolutionary Computation, 2017

2016
A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags.
Algorithms, 2016

A memetic algorithm with a variable block insertion heuristic for single machine total weighted tardiness problem with sequence dependent setup times.
Proceedings of the IEEE Congress on Evolutionary Computation, 2016

2014
An Entropy-Based Upper Bound Methodology for Robust Predictive Multi-Mode RCPSP Schedules.
Entropy, 2014

Artificial Bee Colony for workflow scheduling.
Proceedings of the IEEE Congress on Evolutionary Computation, 2014

2013
Portfolio optimization using improved artificial bee colony approach.
Proceedings of the 2013 IEEE Conference on Computational Intelligence for Financial Engineering & Economics, 2013

2012
An artificial bee colony algorithm for the cardinality-constrained portfolio optimization problems.
Proceedings of the IEEE Congress on Evolutionary Computation, 2012

2011
A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops.
Inf. Sci., 2011

A DE Based Variable Iterated Greedy Algorithm for the No-Idle Permutation Flowshop Scheduling Problem with Total Flowtime Criterion.
Proceedings of the Advanced Intelligent Computing Theories and Applications. With Aspects of Artificial Intelligence, 2011

2010
Economic optimization of resource-constrained project scheduling: a two-phase metaheuristic approach.
J. Zhejiang Univ. Sci. C, 2010

Applying Memetic Algorithm in Multi-Objective Resource Allocation among Competing Projects.
J. Softw., 2010

A discrete artificial bee colony algorithm for the permutation flow shop scheduling problem with total flowtime criterion.
Proceedings of the IEEE Congress on Evolutionary Computation, 2010

2008
A memetic algorithm for maximizing net present value in resource-constrained project scheduling problem.
Proceedings of the IEEE Congress on Evolutionary Computation, 2008

2007
Multilevel Thresholding Using Ant Colony Optimization.
Proceedings of the International MultiConference of Engineers and Computer Scientists 2007, 2007

2006
Application of a Hybrid Ant Colony Optimization for the Multilevel Thresholding in Image Processing.
Proceedings of the Neural Information Processing, 13th International Conference, 2006


  Loading...