Dirk Doleschal

According to our database1, Dirk Doleschal authored at least 7 papers between 2012 and 2018.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2018
A CP Model for a Scheduling Problem with Limited secondary Resources compared to a des Model.
Proceedings of the 2018 Winter Simulation Conference, 2018

2017
Quality based scheduling for an example of semiconductor manufactory.
Proceedings of the 2017 Winter Simulation Conference, 2017

2016
A CP approach for planning lot release dates in a supply chain of semiconductor manufacturing.
Proceedings of the Winter Simulation Conference, 2016

2015
Yield integrated scheduling using machine condition parameter.
Proceedings of the 2015 Winter Simulation Conference, 2015

2014
Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach.
Proceedings of the 2014 Winter Simulation Conference, 2014

2013
Advanced secondary resource control in semiconductor lithography areas: From theory to practice.
Proceedings of the Winter Simulations Conference: Simulation Making Decisions in a Complex World, 2013

2012
Improving flow line scheduling by upstream mixed integer resource allocation in a wafer test facility.
Proceedings of the Winter Simulation Conference, 2012


  Loading...