Erhan Kutanoglu

Orcid: 0000-0002-3947-9130

According to our database1, Erhan Kutanoglu authored at least 17 papers between 2005 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Dynamics, uncertainty and control in circular supply chains.
Comput. Chem. Eng., January, 2024

Optimal Application of Mobile Substation Resources for Transmission System Restoration Under Flood Events.
IEEE Access, 2024

2023
Comparison of two-stage models for electrical substation flood mitigation under uncertainty.
CoRR, 2023

A two-stage stochastic programming model for electric substation flood mitigation prior to an imminent hurricane.
CoRR, 2023

2022
Simulating Energy and Security Interactions in Semiconductor Manufacturing: Insights from the Intel Minifab Model.
Proceedings of the Winter Simulation Conference, 2022

2021
Joint optimization of location, inventory, and condition-based replacement decisions in service parts logistics.
IISE Trans., 2021

2020
Integrated location and inventory planning in service parts logistics with customer-based service levels.
Eur. J. Oper. Res., 2020

2015
An approximate approach for the joint problem of level of repair analysis and spare parts stocking.
Ann. Oper. Res., 2015

2013
Energy-Aware Cooperative Content Distribution Over Wireless Networks: Optimized and Distributed Approaches.
IEEE Trans. Veh. Technol., 2013

Inventory sharing in integrated network design and inventory optimization with low-demand parts.
Eur. J. Oper. Res., 2013

2012
Single-machine scheduling with advanced process control constraints.
J. Sched., 2012

2009
An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels.
Eur. J. Oper. Res., 2009

Heuristic based Scheduling System for Diffusion in Semiconductor Manufacturing.
Proceedings of the 2009 Winter Simulation Conference, 2009

2008
Insights into inventory sharing in service parts logistics systems with time-based service levels.
Comput. Ind. Eng., 2008

Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problem.
Ann. Oper. Res., 2008

2007
Lagrangian relaxation guided problem space search heuristics for generalized assignment problems.
Eur. J. Oper. Res., 2007

2005
Integrating preventive maintenance planning and production scheduling for a single machine.
IEEE Trans. Reliab., 2005


  Loading...