Ewa Ratajczak-Ropel

Orcid: 0000-0002-3697-6668

According to our database1, Ewa Ratajczak-Ropel authored at least 37 papers between 1999 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
Asymptotic Spatiotemporal Averaging of the Power of EEG Signals for Schizophrenia Diagnostics.
Proceedings of the Neural Information Processing - 30th International Conference, 2023

Parallelized Population-Based Multi-Heuristic System with Reinforcement Learning for Solving Multi-Skill Resource-Constrained Project Scheduling Problem with Hierarchical Skills.
Proceedings of the Communication Papers of the 18th Conference on Computer Science and Intelligence Systems, 2023

2022
A-Team Solving Multi-Skill Resource-Constrained Project Scheduling Problem.
Proceedings of the Knowledge-Based and Intelligent Information & Engineering Systems: Proceedings of the 26th International Conference KES-2022, 2022

2021
Novel Methodological Tools for Behavioral Interventions: The Case of HRV-Biofeedback. Sham Control and Quantitative Physiology-Based Assessment of Training Quality and Fidelity.
Sensors, 2021

A Population-Based Framework for Solving the Job Shop Scheduling Problem.
Proceedings of the Computational Collective Intelligence - 13th International Conference, 2021

2020
Heart Rate Variability and Accelerometry as Classification Tools for Monitoring Perceived Stress Levels - A Pilot Study on Firefighters.
Sensors, 2020

2019
A-Team Solving Distributed Resource-Constrained Multi-Project Scheduling Problem.
Vietnam. J. Comput. Sci., 2019

Experimental Evaluation of A-Teams Solving Resource Availability Cost Problem.
Proceedings of the Intelligent Decision Technologies 2019, 2019

2018
Experimental Evaluation of Agent-based Approaches to Solving Multi-mode Resource-Constrained Project Scheduling Problem.
Cybern. Syst., 2018

2016
PLA Based Strategy for Solving RCPSP by a Team of Agents.
J. Univers. Comput. Sci., 2016

PLA Based Strategy for Solving MRCPSP by a Team of Agents.
Proceedings of the Intelligent Decision Technologies 2016 - Proceedings of the 8th KES International Conference on Intelligent Decision Technologies (KES-IDT 2016), 2016

Dynamic Cooperative Interaction Strategy for Solving RCPSP by a Team of Agents.
Proceedings of the Computational Collective Intelligence - 8th International Conference, 2016

2015
Reinforcement Learning Strategy for Solving the MRCPSP by a Team of Agents.
Proceedings of the Intelligent Decision Technologies, 2015

2014
Reinforcement Learning strategies for A-Team solving the Resource-Constrained Project Scheduling Problem.
Neurocomputing, 2014

Reinforcement Learning Strategy for Solving the Resource-Constrained Project Scheduling Problem by a Team of A-Teams.
Proceedings of the Intelligent Information and Database Systems - 6th Asian Conference, 2014

2013
Triple-Action Agents Solving the MRCPSP/Max Problem.
Proceedings of the Agent-Based Optimization, 2013

Team of A-Teams - A Study of the Cooperation between Program Agents Solving Difficult Optimization Problems.
Proceedings of the Agent-Based Optimization, 2013

Reinforcement Learning Strategy for A-Team Solving the Resource-Constrained Project Scheduling Problem.
Proceedings of the Computational Collective Intelligence. Technologies and Applications, 2013

2012
Team of A-Teams for Solving the Resource-Constrained Project Scheduling Problem.
Proceedings of the Advances in Knowledge-Based and Intelligent Information and Engineering Systems, 2012

A-Team for Solving the Resource Availability Cost Problem.
Proceedings of the Computational Collective Intelligence. Technologies and Applications, 2012

2011
A-Team for Solving MRCPSP/max Problem.
Proceedings of the Agent and Multi-Agent Systems: Technologies and Applications, 2011

Double-Action Agents Solving the MRCPSP/Max Problem.
Proceedings of the Computational Collective Intelligence. Technologies and Applications, 2011

Parallel Cooperating A-Teams.
Proceedings of the Computational Collective Intelligence. Technologies and Applications, 2011

2010
Influence of the Working Strategy on A-Team Performance.
Proceedings of the Smart Information and Knowledge Management: Advances, 2010

JABAT Middleware as a Tool for Solving Optimization Problems.
Trans. Comput. Collect. Intell., 2010

Experimental Evaluation of the A-Team Solving Instances of the RCPSP/max Problem.
Proceedings of the Agent and Multi-Agent Systems: Technologies and Applications, 2010

Evaluation of Agents Performance within the A-Team Solving RCPSP/Max Problem.
Proceedings of the Computational Collective Intelligence. Technologies and Applications, 2010

2009
e-JABAT - An Implementation of the Web-Based A-Team.
Proceedings of the Intelligent Agents in the Evolution of Web and Applications, 2009

Solving the RCPSP/max Problem by the Team of Agents.
Proceedings of the Agent and Multi-Agent Systems: Technologies and Applications, 2009

Agent-Based Gene Expression Programming for Solving the RCPSP/max Problem.
Proceedings of the Adaptive and Natural Computing Algorithms, 9th International Conference, 2009

2008
Web Accessible A-Team Middleware.
Proceedings of the Computational Science, 2008

2007
Scheduling Multiple-version Programs on Multiple Processors.
Proceedings of the Computational Intelligence in Reliability Engineering: Evolutionary Techniques in Reliability Analysis and Optimization, 2007

Agent-Based Approach to Solving the Resource Constrained Project Scheduling Problem.
Proceedings of the Adaptive and Natural Computing Algorithms, 8th International Conference, 2007

2006
JADE-Based A-Team as a Tool for Implementing Population-Based Algorithms.
Proceedings of the Sixth International Conference on Intelligent Systems Design and Applications (ISDA 2006), 2006

2003
Population Learning Algorithm for Resource-Constrained Project Scheduling.
Proceedings of the Artificial Neural Nets and Genetic Algorithms, 2003

2001
Population Learning Algorithm Versus Evolutionary Computation.
Proceedings of the 15th International Parallel & Distributed Processing Symposium (IPDPS-01), 2001

1999
Scheduling Fault-Tolerant Programs on Multiple Processors to Maximize Schedule Reliability.
Proceedings of the Computer Safety, 1999


  Loading...