Francesco Zammori

Orcid: 0000-0003-4931-5540

According to our database1, Francesco Zammori authored at least 14 papers between 2010 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
A dynamic operative framework for allocation in automated storage and retrieval systems.
Expert Syst. Appl., 2023

Development and Stress Test of a New Serious Game for Food Operations and Supply Chain Management: Exploring Students' Responses to Difficult Game Settings.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures, 2023

2022
Exploratory Research on Adaptability and Flexibility of a Serious Game in Operations and Supply Chain Management.
Int. J. Online Biomed. Eng., November, 2022

Cycle time calculation of shuttle-lift-crane automated storage and retrieval system.
IISE Trans., 2022

2021
Workload control with shifting bottlenecks: norms optimisation through design of experiments.
Int. J. Math. Model. Numer. Optimisation, 2021

Machine Learning for industrial applications: A comprehensive literature review.
Expert Syst. Appl., 2021

Experiencing the Role of Cooperation and Competition in Operations and Supply Chain Management with a Multiplayer Serious Game.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2020
Lab Networks in Engineering Education: A Proposed Structure for Organizing Information.
Int. J. Online Biomed. Eng., 2020

2019
Comparison of new metaheuristics, for the solution of an integrated jobs-maintenance scheduling problem.
Expert Syst. Appl., 2019

2016
Just-in-time parts feeding policies for paced assembly lines: possible solutions for highly constrained layouts.
Int. Trans. Oper. Res., 2016

2014
Harmony search algorithm for single-machine scheduling problem with planned maintenance.
Comput. Ind. Eng., 2014

2012
Data classification and MTBF prediction with a multivariate analysis approach.
Reliab. Eng. Syst. Saf., 2012

ANP/RPN: a multi criteria evaluation of the Risk Priority Number.
Qual. Reliab. Eng. Int., 2012

2010
The analytic hierarchy and network processes: Applications to the US presidential election and to the market share of ski equipment in Italy.
Appl. Soft Comput., 2010


  Loading...