Gabriela P. Henning

Orcid: 0000-0002-2660-0376

According to our database1, Gabriela P. Henning authored at least 29 papers between 1998 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2022
Ontology network to support the integration of planning and scheduling activities in batch process industries.
J. Ind. Inf. Integr., 2022

2016
A framework to represent, capture, and trace ontology development processes.
Eng. Appl. Artif. Intell., 2016

A novel constraint programming model for large-scale scheduling problems in multiproduct multistage batch plants: Limited resources and campaign-based operation.
Comput. Chem. Eng., 2016

2015
A Network of Ontologies for the Integration of Planning and Scheduling Activities in Batch Process Industries.
Proceedings of the 1st Argentine Symposium on Ontologies and their Applications co-located with 44 Jornadas Argentinas de Informática (44JAIIO), 2015

2014
Integrated scheduling of resource-constrained flexible manufacturing systems using constraint programming.
Expert Syst. Appl., 2014

ISA-88 Formalization. A Step Towards its Integration with the ISA-95 Standard.
Proceedings of the 6th Workshop on Formal Ontologies meet Industry co-located with 8th International Conference on Formal Ontology in Information Systems (FOIS 2014), 2014

2012
A comprehensive constraint programming approach for the rolling horizon-based scheduling of automated wet-etch stations.
Comput. Chem. Eng., 2012

An Operational Approach for Capturing and Tracing the Ontology Development Process.
Proceedings of Joint V Seminar on Ontology Research in Brazil and VII International Workshop on Metamodels, 2012

Formal Specification of Batch Scheduling Problems: A Step toward Integration and Benchmarking.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

ONTOTracED: A Framework to Capture and Trace Ontology Development Processes.
Proceedings of the KEOD 2012 - Proceedings of the International Conference on Knowledge Engineering and Ontology Development, Barcelona, Spain, 4, 2012

2011
PRONTO: An ontology for comprehensive and consistent representation of product information.
Eng. Appl. Artif. Intell., 2011

A CP formulation for scheduling multiproduct multistage batch plants.
Comput. Chem. Eng., 2011

2010
A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations.
Eng. Appl. Artif. Intell., 2010

Reactive scheduling framework based on domain knowledge and constraint programming.
Comput. Chem. Eng., 2010

A Three Level Abstraction Hierarchy to Represent Product Structural Information.
Proceedings of the ICEIS 2010 - Proceedings of the 12th International Conference on Enterprise Information Systems, Volume 2, AIDSS, Funchal, Madeira, Portugal, June 8, 2010

2009
A novel network-based continuous-time representation for process scheduling: Part II. General framework.
Comput. Chem. Eng., 2009

A novel network-based continuous-time representation for process scheduling: Part I. Main concepts and mathematical formulation.
Comput. Chem. Eng., 2009

A Hierarchical Product-Property Model to Support Product Classification and Manage Structural and Planning Data.
Proceedings of the Enterprise Information Systems, 11th International Conference, 2009

2008
PRoduct ONTOlogy: Defining product-related concepts for logistics planning activities.
Comput. Ind., 2008

A Supply Chain Ontology Conceptualization with Focus on Performance Evaluation.
Proceedings of the ICEIS 2008, 2008

2007
A model for capturing and representing the engineering design process.
Expert Syst. Appl., 2007

2005
A Constraint Programming Approach to FMS Scheduling. Consideration of Storage and Transportation Resources.
Inteligencia Artif., 2005

A Constraint Programming Approach to Tool Allocation and Resource Scheduling in FMS.
Proceedings of the 2005 IEEE International Conference on Robotics and Automation, 2005

2003
Representing and Capturing the Experts' Knowledge in a Design Process.
Inteligencia Artif., 2003

2001
Informe ASAI-2000. Simposio Argentino de Inteligencia Artificial.
Inteligencia Artif., 2001

Coordinated: A Language for Enterprise Modeling.
Proceedings of the ICEIS 2001, 2001

2000
Knowledge-Based Interactive Scheduling of Multiproduct Batch Plants.
Proceedings of the Advances in Artificial Intelligence, 2000

1999
Modelling the Design Process as an Enterprise Activity.
Proceedings of the German-Argentinian Workshop on Information Technology, 1999

1998
Coordinates: A Framework for Enterprise Modeling.
Proceedings of the Information Infrastructure Systems for Manufacturing II, 1998


  Loading...