Gabriella Stecco

Orcid: 0000-0002-5830-0183

According to our database1, Gabriella Stecco authored at least 15 papers between 2008 and 2019.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2019
A New ILP Formulation for the Multi-Day Container Drayage Problem.
Proceedings of the 2019 IEEE International Conference on Systems, Man and Cybernetics, 2019

2017
Actors interactions and needs in the European electromobility network.
Proceedings of the 2017 IEEE International Conference on Service Operations and Logistics, 2017

Modelling and solving the multi-day container drayage problem.
Proceedings of the 13th IEEE Conference on Automation Science and Engineering, 2017

2016
Scheduling Internal Operations in Post-Distribution Cross Docking Systems.
IEEE Trans Autom. Sci. Eng., 2016

An Integrated System for Production Scheduling in Steelmaking and Casting Plants.
IEEE Trans Autom. Sci. Eng., 2016

2014
Flight path optimization for minimizing emissions and avoiding weather hazard.
Proceedings of the American Control Conference, 2014

2013
Production scheduling in a Steelmaking and Continuous Casting plant: A case study.
Proceedings of the 2013 IEEE International Conference on Robotics and Automation, 2013

A Mixed Integer Linear Programming model of a Steelmaking and Casting plant.
Proceedings of the 52nd IEEE Conference on Decision and Control, 2013

2012
Modeling and Optimization of Aircraft Trajectories: A review.
Proceedings of the 7th International Conference on System of Systems Engineering, 2012

2011
Solving scheduling problems in distribution centers using symmetry breaking constraints.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2011

2010
Scheduling the internal operations in distribution centers with buffer constraints.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2010

2009
A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine.
J. Sched., 2009

Integrating ICT into Logistics Intermodal Systems: A petri net model of the Trieste port.
Proceedings of the 10th European Control Conference, 2009

The impact of ICT on an Intermodal Transportation System: an analysis by Petri Nets.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2009

2008
A branch-and-cut algorithm for a production scheduling problem with sequence-dependent and time-dependent setup times.
Comput. Oper. Res., 2008


  Loading...