Golam Kabir

Orcid: 0000-0001-9591-0629

According to our database1, Golam Kabir authored at least 21 papers between 2012 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Dynamic predictive analysis of the consequences of gas pipeline failures using a Bayesian network.
Int. J. Crit. Infrastructure Prot., December, 2023

Drivers for Internet of Things (IoT) adoption in supply chains: Implications for sustainability in the post-pandemic era.
Comput. Ind. Eng., September, 2023

Multi-objective closed-loop green supply chain model with disruption risk.
Appl. Soft Comput., March, 2023

2022
Integrated Model for Soft Drink Industry Supply Chain Risk Assessment: Implications for Sustainability in Emerging Economies.
Int. J. Fuzzy Syst., 2022

An advanced decision-making model for evaluating manufacturing plant locations using fuzzy inference system.
Expert Syst. Appl., 2022

2021
A novel particle swarm optimization-based grey model for the prediction of warehouse performance.
J. Comput. Des. Eng., 2021

2020
Role of Ergonomic Factors Affecting Production of Leather Garment-Based SMEs of India: Implications for Social Sustainability.
Symmetry, 2020

Barriers to lean six sigma implementation in the supply chain: An ISM model.
Comput. Ind. Eng., 2020

A hierarchical model for critical success factors in apparel supply chain.
Bus. Process. Manag. J., 2020

2019
A knowledge-based expert system to assess power plant project cost overrun risks.
Expert Syst. Appl., 2019

2018
Consequence-based framework for buried infrastructure systems: A Bayesian belief network model.
Reliab. Eng. Syst. Saf., 2018

Productivity Benchmarking Using Analytic Network Process (ANP) and Data Envelopment Analysis (DEA).
Big Data Cogn. Comput., 2018

2016
Predicting water main failures: A Bayesian model updating approach.
Knowl. Based Syst., 2016

Material selection for femoral component of total knee replacement integrating fuzzy AHP with PROMETHEE.
J. Intell. Fuzzy Syst., 2016

2015
Predicting water main failures using Bayesian model averaging and survival modelling approach.
Reliab. Eng. Syst. Saf., 2015

Integrating failure prediction models for water mains: Bayesian belief network based data fusion.
Knowl. Based Syst., 2015

Selection of hazardous industrial waste transportation firm using extended VIKOR method under fuzzy environment.
Int. J. Data Anal. Tech. Strateg., 2015

Evaluating risk of water mains failure using a Bayesian belief network model.
Eur. J. Oper. Res., 2015

2013
Integrating Modified Delphi with Fuzzy AHP for Concrete Production Facility Location Selection.
Int. J. Fuzzy Syst. Appl., 2013

Comparative Analysis of Artificial Neural Networks and Neuro-Fuzzy Models for Multicriteria Demand Forecasting.
Int. J. Fuzzy Syst. Appl., 2013

2012
Multiple Criteria Inventory Classification Under Fuzzy Environment.
Int. J. Fuzzy Syst. Appl., 2012


  Loading...