Hamid Shahriari

According to our database1, Hamid Shahriari authored at least 14 papers between 2009 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Design of a robust T2 control chart, a re-sampling approach.
Qual. Reliab. Eng. Int., 2022

Monitoring a bi-attribute high-quality process using a mixture probability distribution.
Commun. Stat. Simul. Comput., 2022

A novel robust control chart for monitoring multiple linear profiles in phase II.
Commun. Stat. Simul. Comput., 2022

2021
Reliability monitoring of systems with cumulative shock-based deterioration process.
Reliab. Eng. Syst. Saf., 2021

Robust process capability indices for multiple linear profiles.
Qual. Reliab. Eng. Int., 2021

2020
Robust T2 control chart using median-based estimators.
Qual. Reliab. Eng. Int., 2020

2019
A robust control chart for simple linear profiles in two-stage processes.
Qual. Reliab. Eng. Int., 2019

2017
A Novel Approach to Simultaneous Robust Design of Product Parameters and Tolerances Using Quality Loss and Multivariate ANOVA Concepts.
Qual. Reliab. Eng. Int., 2017

A Genco self-scheduling problem with correlated prices using a new robust optimization approach.
Int. J. Prod. Res., 2017

2016
Estimation of Complicated Profiles in Phase I, Clustering and S-estimation Approaches.
Qual. Reliab. Eng. Int., 2016

Robust optimization under correlated polyhedral uncertainty set.
Comput. Ind. Eng., 2016

2014
An Integrated Approach for Enhancing the Quality of the Product by Combining Robust Design and Customer Requirements.
Qual. Reliab. Eng. Int., 2014

Consistent and robust ranking in imprecise data envelopment analysis under perturbations of random subsets of data.
OR Spectr., 2014

2009
Monitoring dependent process steps using robust cause-selecting control charts.
Qual. Reliab. Eng. Int., 2009


  Loading...