Harun Aydilek

Orcid: 0000-0002-9552-1030

According to our database1, Harun Aydilek authored at least 9 papers between 2010 and 2020.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2020
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan.
Appl. Math. Comput., 2020

2018
No-wait flowshop scheduling problem with two criteria; total tardiness and makespan.
Eur. J. Oper. Res., 2018

2017
Minimising maximum tardiness in assembly flowshops with setup times.
Int. J. Prod. Res., 2017

2015
The two stage assembly flowshop scheduling problem to minimize total tardiness.
J. Intell. Manuf., 2015

2014
Total completion time with makespan constraint in no-wait flowshops with setup times.
Eur. J. Oper. Res., 2014

Single machine scheduling problem with interval processing times to minimize mean weighted completion time.
Comput. Oper. Res., 2014

2012
Heuristics for no-wait flowshops with makespan subject to mean completion time.
Appl. Math. Comput., 2012

2010
Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time.
Comput. Math. Appl., 2010

Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times.
Comput. Math. Appl., 2010


  Loading...