Hua Gong

Orcid: 0000-0003-2260-4617

According to our database1, Hua Gong authored at least 17 papers between 2002 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Cooperative Game Theory Based Coordinated Scheduling of Two-Machine Flow-Shop and Transportation.
J. Syst. Sci. Complex., December, 2023

2022
A Flexible Data Evaluation System for Improving the Quality and Efficiency of Laboratory Analysis and Testing.
Inf., 2022

2020
Enzyme-powered Janus platelet cell robots for active and targeted drug delivery.
Sci. Robotics, 2020

Vehicle detection based on improved multitask cascaded convolutional neural network and mixed image enhancement.
IET Image Process., 2020

Scheduling on a Single Machine and Parallel Machines with Batch Deliveries and Potential Disruption.
Complex., 2020

2019
Vehicle Attribute Recognition for Normal Targets and Small Targets Based on Multitask Cascaded Network.
Complex., 2019

Prediction of Ammunition Storage Reliability Based on Improved Ant Colony Algorithm and BP Neural Network.
Complex., 2019

Minimizing total flow time in two-stage hybrid flowshop with parallel machines and a single batching machine.
Proceedings of the 15th IEEE International Conference on Automation Science and Engineering, 2019

2017
Bicriteria Scheduling on a Single Batching Machine with Transportation and Deterioration to Minimize Total Completion Time and Production Costs.
Asia Pac. J. Oper. Res., 2017

2013
Scheduling two agents with sum-of-processing-times-based deterioration on a single machine.
Appl. Math. Comput., 2013

2011
Two-machine flowshop scheduling with intermediate transportation under job physical space consideration.
Comput. Oper. Res., 2011

A MPI/OpenMP Hybrid Parallel Nonlinear Equation Solver Used in Finite Element Analysis.
Proceedings of the Sixth Chinagrid Annual Conference, ChinaGrid 2011, Dalian, Liaoning, 2011

2010
A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times.
Comput. Oper. Res., 2010

2009
Low temperature growth of ZnO rods by EDTA-assisted hydrothermal synthesis.
Proceedings of the 4th IEEE International Conference on Nano/Micro Engineered and Molecular Systems, 2009

2008
The Coordination of Two Parallel Machines Scheduling and Batch Deliveries.
Proceedings of the Computing and Combinatorics, 14th Annual International Conference, 2008

A Two-Stage Flexible Flowshop Problem with Deterioration.
Proceedings of the Computing and Combinatorics, 14th Annual International Conference, 2008

2002
An applied vegetation canopy model and its application in inversion of vegetation coverage and water content.
Proceedings of the IEEE International Geoscience and Remote Sensing Symposium, 2002


  Loading...