Ichie Watanabe

According to our database1, Ichie Watanabe authored at least 2 papers between 1995 and 2002.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2002
A study of the multi-stage flowshop scheduling problem with alternative operation assignments.
Math. Comput. Simul., 2002

1995
A new parallel algorithm for the <i>n</i>-Job, <i>m</i>-machine flow-shop scheduling problem.
Syst. Comput. Jpn., 1995


  Loading...