2024
Metaheuristics for the bi-objective resource-constrained project scheduling problem with time-dependent resource costs: An experimental comparison.
Comput. Oper. Res., March, 2024

2023
Comparing two SVM models through different metrics based on the confusion matrix.
Comput. Oper. Res., April, 2023

2022
The Concordance Test, an Alternative to Kruskal-Wallis Based on the Kendall-$\tau$ Distance: An R Package.
R J., 2022

Ranking ranges in cross-efficiency evaluations: A metaheuristic approach.
J. Oper. Res. Soc., 2022

Support Vector Machine with feature selection: A multiobjective approach.
Expert Syst. Appl., 2022

2021
Russell Graph efficiency measures in Data Envelopment Analysis: The multiplicative approach.
Eur. J. Oper. Res., 2021

2020
Multi-objective evolutionary algorithms for a reliability location problem.
Eur. J. Oper. Res., 2020

2018
Bounded directional distance function models.
Central Eur. J. Oper. Res., 2018

2017
Rank aggregation in cyclic sequences.
Optim. Lett., 2017

On relaxing the integrality of the allocation variables of the reliability fixed-charge location problem.
J. Glob. Optim., 2017

2015
Strengthening the reliability fixed-charge location model using clique constraints.
Comput. Oper. Res., 2015

2013
Ranking ranges in cross-efficiency evaluations.
Eur. J. Oper. Res., 2013

2012
Design and analysis of hybrid metaheuristics for the Reliability p-Median Problem.
Eur. J. Oper. Res., 2012

2007
A Hybrid Genetic Algorithm Based on Intelligent Encoding for Project Scheduling.
Proceedings of the International MultiConference of Engineers and Computer Scientists 2007, 2007

2005
Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics.
Eur. J. Oper. Res., 2005

2004
A decision support system for a real vehicle routing problem.
Eur. J. Oper. Res., 2004

2003
Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms.
J. Oper. Res. Soc., 2003

2001
A Robust Genetic Algorithm for Resource Allocation in Project Scheduling.
Ann. Oper. Res., 2001