Jay B. Ghosh

According to our database1, Jay B. Ghosh authored at least 28 papers between 1984 and 2011.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2011
Minimizing weighted mean absolute deviation of job completion times from their weighted mean.
Appl. Math. Comput., 2011

2008
FPTAS for half-products minimization with scheduling applications.
Discret. Appl. Math., 2008

2007
Scheduling with tool changes to minimize total completion time under controllable machining conditions.
Comput. Oper. Res., 2007

Batch scheduling to minimize the weighted number of tardy jobs.
Comput. Ind. Eng., 2007

Market- and Merit-Based Adjustment of faculty Salaries.
Asia Pac. J. Oper. Res., 2007

Customer order scheduling on a single machine with family setup times: Complexity and algorithms.
Appl. Math. Comput., 2007

2005
New heuristic for the dynamic layout problem.
J. Oper. Res. Soc., 2005

Maximum diversity/similarity models with extension to part grouping.
Int. Trans. Oper. Res., 2005

2004
Scheduling with tool changes to minimize total completion time: Basic results and SPT performance.
Eur. J. Oper. Res., 2004

1999
Analysis of Lagrangian Lower Bounds for a Graph Partitioning Problem.
Oper. Res., 1999

1997
Batch scheduling to minimize maximum lateness.
Oper. Res. Lett., 1997

Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks.
Oper. Res., 1997

Job selection in a heavily loaded shop.
Comput. Oper. Res., 1997

1996
Computational aspects of the maximum diversity problem.
Oper. Res. Lett., 1996

1994
Batch scheduling to minimize total completion time.
Oper. Res. Lett., 1994

1993
Delivery time quotation and order processing with forbidden early shipments.
Comput. Oper. Res., 1993

On the general solution for a class of early/tardy problems.
Comput. Oper. Res., 1993

1992
On the Minimization of Completion Time Variance with a Bicriteria Extension.
Oper. Res., 1992

1991
Some clarifications on the bicriteria scheduling of unit execution time jobs on a single machine.
Comput. Oper. Res., 1991

Scheduling to minimize weighted earliness and tardiness about a common due-date.
Comput. Oper. Res., 1991

On the minimization of the weighted number of tardy jobs with random processing times and deadline.
Comput. Oper. Res., 1991

1990
CON due-date determination and sequencing.
Comput. Oper. Res., 1990

Scheduling about a common due date with earliness and tardiness penalties.
Comput. Oper. Res., 1990

1988
Evaluating multiprocessor performance: an exercise in metamodeling.
Simul., 1988

1986
Performance evaluation of interconnection networks in multiprocessor systems.
Proceedings of the 19th Annual Symposium on Simulation, 1986

1985
General simulation of multiprocessor interconnection networks.
Proceedings of the 17th conference on Winter simulation, 1985

Asynchronous control of discrete event simulation.
Proceedings of the 18th Annual Symposium on Simulation, 1985

1984
Asynchronous simulation of some discrete time models.
Proceedings of the 16th conference on Winter simulation, 1984


  Loading...