José Pedro García-Sabater

Orcid: 0000-0002-9097-2852

According to our database1, José Pedro García-Sabater authored at least 19 papers between 2005 and 2021.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2021
Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes.
Central Eur. J. Oper. Res., 2021

2020
Hybrid approach of discrete event simulation integrated with location search algorithm in a cells assignment problem: a case study.
Central Eur. J. Oper. Res., 2020

Coordination mechanisms with mathematical programming models for decentralized decision-making: a literature review.
Central Eur. J. Oper. Res., 2020

Lagrangian relaxation of the generic materials and operations planning model.
Central Eur. J. Oper. Res., 2020

Redesigning the in-plant supply logistics: A case study.
Comput. Ind. Eng., 2020

2017
A practical model for managing inventories with unknown costs and a budget constraint.
Int. J. Prod. Res., 2017

2012
Economic lot scheduling with deliberated and controlled coproduction.
Eur. J. Oper. Res., 2012

A Mixed-Integer Linear Programming Model for Transportation Planning in the Full Truck Load Strategy to Supply Products with Unbalanced Demand in the Just in Time Context: A Case Study.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

A Parallelizable Heuristic for Solving the Generic Materials and Operations Planning in a Supply Chain Network: A Case Study from the Automotive Industry.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

2011
The Generic Materials and Operations Planning (GMOP) Problem Solved Iteratively: A Case Study in Multi-site Context.
Proceedings of the Advances in Production Management Systems. Value Networks: Innovation, Technologies, and Management, 2011

2010
Coordinating a Cooperative Automotive Manufacturing Network - An Agent-Based Model.
Proceedings of the Cooperative Design, Visualization, and Engineering, 2010

2009
Cooperative Supply Chain Re-scheduling: The Case of an Engine Supply Chain.
Proceedings of the Cooperative Design, 2009

2008
Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled.
Discret. Appl. Math., 2008

Cooperative Multisite Production Re-scheduling.
Proceedings of the Cooperative Design, 2008

2007
Material Requirement Planning with fuzzy constraints and fuzzy coefficients.
Fuzzy Sets Syst., 2007

2006
Fuzzy Production Planning Model for Automobile Seat Assembling.
Proceedings of the Soft Methods for Integrated Uncertainty Modelling, 2006

Comparing dispatching rules in dynamic hybrid flow shops.
Proceedings of 11th IEEE International Conference on Emerging Technologies and Factory Automation, 2006

2005
Group technology in a hybrid flowshop environment: A case study.
Eur. J. Oper. Res., 2005

A fuzzy approach to capacity constrained MRP systems.
Proceedings of the Joint 4th Conference of the European Society for Fuzzy Logic and Technology and the 11th Rencontres Francophones sur la Logique Floue et ses Applications, 2005


  Loading...