Julien Fondrevelle

Orcid: 0000-0002-8505-0212

According to our database1, Julien Fondrevelle authored at least 8 papers between 2005 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem.
Int. J. Prod. Res., 2022

2021
Predicting length of stay with administrative data from acute and emergency care: an embedding approach.
Proceedings of the 17th IEEE International Conference on Automation Science and Engineering, 2021

2015
Job-shop production scheduling with reverse flows.
Eur. J. Oper. Res., 2015

An integrated approach for sustainable supply chain planning.
Comput. Oper. Res., 2015

2013
An Integrated Approach for the Optimization of the Sustainable Performance: A Wood Supply Chain.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

2006
Permutation flowshop scheduling problems with maximal and minimal time lags.
Comput. Oper. Res., 2006

2005
Résolution exacte de problèmes d'ordonnancement de type flowshop de permutation en présence de contraintes d'écarts temporels entre opérations. (Exact solution to permutation flowshop problems with time lag constraints between operations).
PhD thesis, 2005

Minimizing makespan in flowshop with time lags
CoRR, 2005


  Loading...