Jun Guo

Orcid: 0000-0003-3469-4955

According to our database1, Jun Guo authored at least 34 papers between 2011 and 2026.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2026
Integrated optimization approach to cell formation, cell layout, and group scheduling for dynamic cellular manufacturing system.
Expert Syst. Appl., 2026

2025
Multi-objective grey wolf optimizer based on reinforcement learning for distributed hybrid flowshop scheduling towards mass personalized manufacturing.
Expert Syst. Appl., 2025

Modeling and optimization of batch scheduling problem considering the process granularity in shared manufacturing.
Comput. Ind. Eng., 2025

Categorized attention based hierarchical-agents reinforcement learning for multi-objective dynamic job shop scheduling problem with machine deterioration.
Appl. Soft Comput., 2025

2024
Dynamic Balancing of U-Shaped Robotic Disassembly Lines Using an Effective Deep Reinforcement Learning Approach.
IEEE Trans. Ind. Informatics, April, 2024

A Correlation-Redundancy Guided Evolutionary Algorithm and Its Application to High-Dimensional Feature Selection in Classification.
Neural Process. Lett., April, 2024

Multi-objective fuzzy partial disassembly line balancing considering preventive maintenance scenarios using enhanced hybrid artificial bee colony algorithm.
Expert Syst. Appl., March, 2024

A stacked ensemble method based on TCN and convolutional bi-directional GRU with multiple time windows for remaining useful life estimation.
Appl. Soft Comput., January, 2024

Engineering characteristics prioritization for quality function deployment by using CRITIC and cumulative prospect theory with extended hesitant fuzzy linguistic term sets.
J. Intell. Fuzzy Syst., 2024

A Pareto-based hybrid genetic simulated annealing algorithm for multi-objective hybrid production line balancing problem considering disassembly and assembly.
Int. J. Prod. Res., 2024

A rapid oriented detection method of virtual components for augmented assembly.
Expert Syst. Appl., 2024

MHT: A multiscale hourglass-transformer for remaining useful life prediction of aircraft engine.
Eng. Appl. Artif. Intell., 2024

A hybrid estimation of distribution algorithm for solving assembly flexible job shop scheduling in a distributed environment.
Eng. Appl. Artif. Intell., 2024

A K-means-Teaching Learning based optimization algorithm for parallel machine scheduling problem.
Appl. Soft Comput., 2024

A multi-population cooperative coevolution artificial bee colony algorithm for partial multi-robotic disassembly line balancing problem considering preventive maintenance scenarios.
Adv. Eng. Informatics, 2024

2023
A novel MILP model and an improved genetic algorithm for disassembly line balancing and sequence planning with partial destructive mode.
Comput. Ind. Eng., December, 2023

A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows.
Comput. Oper. Res., November, 2023

Integrated scheduling for remanufacturing system considering component commonality using improved multi-objective genetic algorithm.
Comput. Ind. Eng., August, 2023

Digital twin-based job shop anomaly detection and dynamic scheduling.
Robotics Comput. Integr. Manuf., 2023

Optimization of pump scheduling in waterworks considering load balancing using improved genetic algorithm.
J. Intell. Fuzzy Syst., 2023

A two-stage interactive evolutionary algorithm for multi-objective asynchronous parallel selective disassembly sequence planning problem.
Comput. Ind. Eng., 2023

2022
Multi-objective optimisation of stochastic hybrid production line balancing including assembly and disassembly tasks.
Int. J. Prod. Res., 2022

Two-sided matching decision-making model for complex product system based on life-cycle sustainability assessment.
Expert Syst. Appl., 2022

Interval forecasting for urban water demand using PSO optimized KDE distribution and LSTM neural networks.
Appl. Soft Comput., 2022

2021
A multi-stage group decision making for strategic supplier selection based on prospect theory with interval-valued q-rung orthopair fuzzy linguistic sets.
J. Intell. Fuzzy Syst., 2021

Deep learning with long short-term memory neural networks combining wavelet transform and principal component analysis for daily urban water demand forecasting.
Expert Syst. Appl., 2021

Energy-cost-aware resource-constrained project scheduling for complex product system with activity splitting and recombining.
Expert Syst. Appl., 2021

2019
A Hybrid Multi-Objective Evolutionary Algorithm With Heuristic Adjustment Strategies and Variable Neighbor-Hood Search for Flexible Job-Shop Scheduling Problem Considering Flexible Rest Time.
IEEE Access, 2019

2018
Effect of inspection policy on recycling decision considering recovery price and used product quality.
Proceedings of the IEEE International Conference on Information and Automation, 2018

2017
Hybrid artificial bee colony algorithm with a rescheduling strategy for solving flexible job shop scheduling problems.
Comput. Ind. Eng., 2017

A Novel Method for Resources Collaborative Evaluation in Group Distributed Manufacturing.
Proceedings of the 5th International Conference on Control, Mechatronics and Automation, 2017

2015
A Pareto supplier selection algorithm for minimum the life cycle cost of complex product system.
Expert Syst. Appl., 2015

2011
Rank B2C e-commerce websites in e-alliance based on AHP and fuzzy TOPSIS.
Expert Syst. Appl., 2011

An extended support vector machine forecasting framework for customer churn in e-commerce.
Expert Syst. Appl., 2011


  Loading...