Lucio Bianco

According to our database1, Lucio Bianco authored at least 30 papers between 1977 and 2022.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Project scheduling with generalized precedence relations: A new method to analyze criticalities and flexibilities.
Eur. J. Oper. Res., 2022

2019
A chance constrained optimization approach for resource unconstrained project scheduling with uncertainty in activity execution intensity.
Comput. Ind. Eng., 2019

2017
The Resource Constrained Project Scheduling Problem: A theoretical comparison between a recent formulation and the main time indexed linear programming based approaches.
RAIRO Oper. Res., 2017

2016
A Game-Theoretic Approach for Regulating Hazmat Transportation.
Transp. Sci., 2016

Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities.
OR Spectr., 2016

2014
Locating sensors to observe network arc flows: Exact and heuristic approaches.
Comput. Oper. Res., 2014

2012
An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations.
Eur. J. Oper. Res., 2012

Minimizing the completion time of a project under resource constraints and feeding precedence relations: an exact algorithm.
4OR, 2012

2011
A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations.
Comput. Oper. Res., 2011

Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound.
4OR, 2011

2010
A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time.
Networks, 2010

2009
Advanced Topics in Project Management Process.
Proceedings of the Advances in Production Management Systems. New Challenges, New Approaches, 2009

An Exact Algorithm to Minimize the Makespan in Project Scheduling with Scarce Resources and Feeding Precedence Relations.
Proceedings of the 8th Cologne-Twente Workshop on Graphs and Combinatorial Optimization, 2009

2006
Scheduling models for air traffic control in terminal areas.
J. Sched., 2006

Combinatorial aspects of the sensor location problem.
Ann. Oper. Res., 2006

2001
A Network Based Model for Traffic Sensor Location with Implications on O/D Matrix Estimates.
Transp. Sci., 2001

1999
A Set Partitioning Approach to the Crew Scheduling Problem.
Oper. Res., 1999

Minimizing total completion time subject to release dates and sequence-dependentprocessing times.
Ann. Oper. Res., 1999

1998
Heuristics for multimode scheduling problems with dedicated resources.
Eur. J. Oper. Res., 1998

1997
Dynamic Programming Strategies for the Traveling Salesman Problem with Time Window and Precedence Constraints.
Oper. Res., 1997

Linear Algorithms for Preemptive Scheduling of Multiprocessor Tasks Subject to Minimal Lateness.
Discret. Appl. Math., 1997

An Optimal Algorithm to Find the Jump Number of Partially Ordered Sets.
Comput. Optim. Appl., 1997

Preemptive multiprocessor task scheduling with release times and time windows.
Ann. Oper. Res., 1997

1995
Scheduling Independent Tasks with Multiple Modes.
Discret. Appl. Math., 1995

Scheduling multiprocessor tasks on a dynamic configuration of dedicated processors.
Ann. Oper. Res., 1995

1994
Scheduling Preemptive Multiprocessor Tasks on Dedicated Processors.
Perform. Evaluation, 1994

1993
The traveling salesman problem with cumulative costs.
Networks, 1993

Preemptive Scheduling of Multiprocessor Tasks on the Dedicated Processor System Subject to Minimal Lateness.
Inf. Process. Lett., 1993

The minimization of resource costs in scheduling independent tasks with fixed completion time.
Proceedings of the System Modelling and Optimization: Proceedings of the 16th IFIP-TC7 Conference, 1993

1977
A method for determining the optimal districting in urban emergency services.
Comput. Oper. Res., 1977


  Loading...