Mahmood Shafiee

According to our database1, Mahmood Shafiee authored at least 17 papers between 2011 and 2021.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

On csauthors.net:

Bibliography

2021
A Kernel Design Approach to Improve Kernel Subspace Identification.
IEEE Trans. Ind. Electron., 2021

2020
A stochastic simulation-optimization model for base-warranty and extended-warranty decision-making of under- and out-of-warranty products.
Reliab. Eng. Syst. Saf., 2020

Bayesian Network Modelling for the Wind Energy Industry: An Overview.
Reliab. Eng. Syst. Saf., 2020

A bi-objective optimization framework for designing an efficient fuel supply chain network in post-earthquakes.
Comput. Ind. Eng., 2020

2019
Maintenance optimization and inspection planning of wind energy assets: Models, methods and strategies.
Reliab. Eng. Syst. Saf., 2019

Mixed kernel canonical variate dissimilarity analysis for incipient fault monitoring in nonlinear dynamic processes.
Comput. Chem. Eng., 2019

Reconstruction based Fault Prognosis in Dynamic Processes using Canonical Variate Analysis.
Proceedings of the 25th International Conference on Automation and Computing, 2019

2018
Structural Health Monitoring (SHM) and Determination of Surface Defects in Large Metallic Structures using Ultrasonic Guided Waves.
Sensors, 2018

2016
Classical Optimal Replacement Strategies Revisited.
IEEE Trans. Reliab., 2016

2015
An opportunistic condition-based maintenance policy for offshore wind turbine blades subjected to degradation and environmental shocks.
Reliab. Eng. Syst. Saf., 2015

An optimal age-based group maintenance policy for multi-unit degrading systems.
Reliab. Eng. Syst. Saf., 2015

A fuzzy analytic network process model to mitigate the risks associated with offshore wind farms.
Expert Syst. Appl., 2015

2013
Maintenance models in warranty: A literature review.
Eur. J. Oper. Res., 2013

An Optimal Number-Dependent Preventive Maintenance Strategy for Offshore Wind Turbine Blades Considering Logistics.
Adv. Oper. Res., 2013

2012
Developing an Activity-Based Costing Approach to Maximize the Efficiency of Customer Relationship Management Projects
CoRR, 2012

Warranty and Optimal Upgrade Strategy for Used Systems: an Electric Drill Case Study.
Asia Pac. J. Oper. Res., 2012

2011
On optimal upgrade level for used products under given cost structures.
Reliab. Eng. Syst. Saf., 2011


  Loading...