Marco Schulze

According to our database1, Marco Schulze authored at least 7 papers between 2010 and 2021.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2021
Correction to: Solution procedures for block selection and sequencing in flat-bedded potash underground mines.
OR Spectr., 2021

Solution procedures for block selection and sequencing in flat-bedded potash underground mines.
OR Spectr., 2021

A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers.
Eur. J. Oper. Res., 2021

2017
Staff and machine shift scheduling in a German potash mine.
J. Sched., 2017

2016
Machine scheduling in underground mining: an application in the potash industry.
OR Spectr., 2016

2013
Cumulus4j: A Provably Secure Database Abstraction Layer.
Proceedings of the Security Engineering and Intelligence Informatics, 2013

2010
Scheduling in the Context of Underground Mining.
Proceedings of the Operations Research Proceedings 2010, 2010


  Loading...