Mohd Khairol Anuar bin Mohd Ariffin

According to our database1, Mohd Khairol Anuar bin Mohd Ariffin authored at least 12 papers between 2013 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Review evolution of dual-resource-constrained scheduling problems in manufacturing systems: modeling and scheduling methods' trends.
Soft Comput., December, 2023

2022
A comprehensive model for determining technological innovation level in supply chains using green investment, eco-friendly design and customer collaborations factors.
RAIRO Oper. Res., 2022

A New Fuzzy TOPSIS-Based Machine Learning Framework for Minimizing Completion Time in Supply Chains.
Int. J. Fuzzy Syst., 2022

2017
A multi-period scheduling method for trading-off between skilled-workers allocation and outsource service usage in dynamic CMS.
Int. J. Prod. Res., 2017

An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources.
Ann. Oper. Res., 2017

2016
A multi-period scheduling of dynamic cellular manufacturing systems in the presence of cost uncertainty.
Comput. Ind. Eng., 2016

2015
Construction of fuzzy ¯ X - S control charts with an unbiased estimation of standard deviation for a triangular fuzzy random variable.
J. Intell. Fuzzy Syst., 2015

2014
Solving Continuous Trajectory and Forward Kinematics Simultaneously Based on ANN.
Int. J. Comput. Commun. Control, 2014

Fuzzy mean and range control charts for monitoring fuzzy quality characteristics: A case study in food industries using chicken nugget.
Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management, 2014

2013
Distribution Network Design for Fixed Lifetime Perishable Products: A Model and Solution Approach.
J. Appl. Math., 2013

Desirability Improvement of Committee Machine to Solve Multiple Response Optimization Problems.
Adv. Artif. Neural Syst., 2013

Integrated Scheduling of Quay Cranes and Automated Lifting Vehicles in Automated Container Terminal with Unlimited Buffer Space.
Proceedings of the Advances in Systems Science, 2013


  Loading...