Moncer Hariga

Orcid: 0000-0003-1797-7830

According to our database1, Moncer Hariga authored at least 23 papers between 1996 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
A Single-Vendor Multi-Retailer VMI Partnership Under Individual Carbon-Cap Constraints.
IEEE Access, 2023

2022
Vendor Managed Inventory Coordination Under Contractual Storage Agreement and Carbon Regulation Policies.
IEEE Access, 2022

2020
Sustainable dynamic lot sizing models for cold products under carbon cap policy.
Comput. Ind. Eng., 2020

2019
Integrated time-cost tradeoff and resources leveling problems with allowed activity splitting.
Int. Trans. Oper. Res., 2019

Operational and environmental decisions for a two-stage supply chain under vendor managed consignment inventory partnership.
Int. J. Prod. Res., 2019

2013
Scheduling and lot sizing models for the single-vendor multi-buyer problem under consignment stock partnership.
J. Oper. Res. Soc., 2013

An AHP-DEA-based vendor selection approach for an online trading platform.
Int. J. Appl. Decis. Sci., 2013

A vendor managed inventory model under contractual storage agreement.
Comput. Oper. Res., 2013

An integrated retail space allocation and lot sizing models under vendor managed inventory and consignment stock arrangements.
Comput. Ind. Eng., 2013

2011
Inventory models for multi-warehouse systems under fixed and flexible space leasing contracts.
Comput. Ind. Eng., 2011

2008
Economic production quantity model with a shifting production rate.
Int. Trans. Oper. Res., 2008

2007
A joint optimisation model for inventory replenishment, product assortment, shelf space and display area allocation decisions.
Eur. J. Oper. Res., 2007

2006
Heuristic procedures for the single facility inspection problem with minimal repair and increasing failure rate.
J. Oper. Res. Soc., 2006

A discounted integrated inspection-maintenance model for a single deteriorating production facility.
Int. Trans. Oper. Res., 2006

Integrated inventory control and inspection policies with deterministic demand.
Comput. Oper. Res., 2006

2005
A chance-constrained multi-period model for a special multi-reservoir system.
Comput. Oper. Res., 2005

2001
A single-period model for conjunctive use of ground and surface water under severe overdrafts and water deficit.
Eur. J. Oper. Res., 2001

2000
Setup cost reduction in (<i>Q, r</i>) policy with lot size, setup time and lead-time interactions.
J. Oper. Res. Soc., 2000

Economic lot scheduling problem with imperfect production processes.
J. Oper. Res. Soc., 2000

1999
Some stochastic inventory models with deterministic variable lead time.
Eur. J. Oper. Res., 1999

1998
A Reply.
J. Oper. Res. Soc., 1998

1997
A lot sizing heuristic for deteriorating items with shortages in growing and declining markets.
Comput. Oper. Res., 1997

1996
Lot-sizing heuristics for continuous time-varying demand and shortages.
Comput. Oper. Res., 1996


  Loading...