Pablo Viveros

Orcid: 0000-0003-3059-1684

According to our database1, Pablo Viveros authored at least 13 papers between 2012 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
Wind farm life cycle cost modelling based on oversizing capacity under load sharing configuration.
Reliab. Eng. Syst. Saf., August, 2023

Extended Framework for Preventive Maintenance Planning: Risk and Behaviour Analysis of a Proposed Optimization Model.
Complex., 2023

2021
An optimization framework for opportunistic planning of preventive maintenance activities.
Reliab. Eng. Syst. Saf., 2021

Assessing the Impact of Virtual Standby Systems in Failure Propagation for Complex Wastewater Treatment Processes.
Complex., 2021

2020
Sizing of a Standalone PV System with Battery Storage for a Dairy: A Case Study from Chile.
Complex., 2020

2018
Graphical analysis for overall effectiveness management: A graphical method to support operation and maintenance performance assessment.
Qual. Reliab. Eng. Int., 2018

Corrigendum to "Reliability Assessment Methodology for Massive Manufacturing Using Multi-Function Equipment".
Complex., 2018

Reliability Assessment Methodology for Massive Manufacturing Using Multi-Function Equipment.
Complex., 2018

2016
Graphical Analysis for Operation Management: A Graphical Method to Support Operation Decision Making.
Qual. Reliab. Eng. Int., 2016

2014
A case study of GAMM (graphical analysis for maintenance management) in the mining industry.
Reliab. Eng. Syst. Saf., 2014

A Case Study of GAMM (Graphical Analysis for Maintenance Management) Applied to Water Pumps in a Sewage Treatment Plant, Chile.
Qual. Reliab. Eng. Int., 2014

2013
The Graphical Analysis for Maintenance Management Method: A Quantitative Graphical Analysis to Support Maintenance Management Decision Making.
Qual. Reliab. Eng. Int., 2013

2012
Advanced model for maintenance management in a continuous improvement cycle: integration into the business strategy.
Int. J. Syst. Assur. Eng. Manag., 2012


  Loading...