Paul C. Xirouchakis

According to our database1, Paul C. Xirouchakis
  • authored at least 35 papers between 1993 and 2015.
  • has a "Dijkstra number"2 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

On csauthors.net:

Bibliography

2015
Design modification supporting method based on product usage data in closed-loop PLM.
Int. J. Computer Integrated Manufacturing, 2015

A holistic production planning approach in a reconfigurable manufacturing system with energy consumption and environmental effects.
Int. J. Computer Integrated Manufacturing, 2015

2009
A branch and bound algorithm for disassembly scheduling with assembly product structure.
JORS, 2009

A framework for RFID applications in product lifecycle management.
Int. J. Computer Integrated Manufacturing, 2009

2007
Product Life-Cycle Metadata Modeling and Its Application with RDF.
IEEE Trans. Knowl. Data Eng., 2007

System architecture for closed-loop PLM.
Int. J. Computer Integrated Manufacturing, 2007

Research issues on closed-loop PLM.
Computers in Industry, 2007

A divide and conquer algorithm for medial surface calculation of planar polyhedra.
Computer-Aided Design, 2007

A new concept of compatibility structure in new product development.
Advanced Engineering Informatics, 2007

Fuzzy compatibility structures in new product development.
Advanced Engineering Informatics, 2007

A Methodology for Modeling a Quality Embedded Remanufacturing System.
Proceedings of the Advances in Production Management Systems, 2007

A primitive ontology model for product lifecycle meta data in the closed-loop PLM.
Proceedings of the Enterprise Interoperability II, 2007

2006
Singularity analysis of a 3-DOF parallel manipulator with R-P-S joint structure.
Robotica, 2006

A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints.
JORS, 2006

Strategy features for communicating aesthetic shapes for manufacturing.
Int. J. Computer Integrated Manufacturing, 2006

Algorithms and an extended STEP-NC-compliant data model for wire electro discharge machining based on 3D representations.
Int. J. Computer Integrated Manufacturing, 2006

Predictive algorithm to determine the suitable time to change automotive engine oil.
Computers & Industrial Engineering, 2006

CAGD - computer-aided gravestone design.
Advances in Engineering Software, 2006

Streamlining Asset Maintenance throughout Analysis of its Usage Data.
Proceedings of the Lean Business Systems and Beyond: First IFIP TC 5 Advanced Production Management Systems Conference (APMS'2006), 2006

2005
Kinematics of a 3-DOF parallel manipulator with an R-P-S joint structure.
Robotica, 2005

Construction of global fuzzy preference structures from two-parameter single-criterion fuzzy outranking relations.
Fuzzy Sets and Systems, 2005

Parametric tool correction algorithm for 5-axis machining.
Advances in Engineering Software, 2005

An Optimal Algorithm for Disassembly Scheduling with Assembly Product Structure.
Proceedings of the KI 2005: Advances in Artificial Intelligence, 2005

A Lagrangean Relaxation Approach for Capacitated Disassembly Scheduling.
Proceedings of the Computational Science and Its Applications, 2005

Capacitated Disassembly Scheduling: Minimizing the Number of Products Disassembled.
Proceedings of the Computational Science and Its Applications, 2005

2004
A two-stage heuristic for disassembly scheduling with assembly product structure.
JORS, 2004

Construction of a two-parameters fuzzy outranking relation from fuzzy evaluations.
Fuzzy Sets and Systems, 2004

On the medial surface approximations of extrusions.
Eng. Comput. (Lond.), 2004

High accuracy spline interpolation for 5-axis machining.
Computer-Aided Design, 2004

2003
Multiple criteria decision aid for selecting the best product end of life scenario.
Int. J. Computer Integrated Manufacturing, 2003

Research issues on product lifecycle management and information tracking using smart embedded systems.
Advanced Engineering Informatics, 2003

2002
Towards a Knowledge-Based Model for the Computer Aided Design Process.
Concurrent Engineering: R&A, 2002

Container spaces and functional features for top-down 3D layout design.
Computer-Aided Design, 2002

2000
A Petri net model for integrated process and job shop production planning.
J. Intelligent Manufacturing, 2000

1993
Data Parallel Visual Reconstruction and Partitioning Algorithms.
Parallel Processing Letters, 1993


  Loading...