Peng Guo

Orcid: 0000-0001-5520-7701

Affiliations:
  • Southwest Jiaotong University, School of Mechanical Engineering, Chengdu, China (PhD 2014)


According to our database1, Peng Guo authored at least 15 papers between 2011 and 2026.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book  In proceedings  Article  PhD thesis  Dataset  Other 

Links

Online presence:

On csauthors.net:

Bibliography

2026
Multi-objective scheduling of cloud-edge cooperation in distributed manufacturing via multi-agent deep reinforcement learning.
Int. J. Prod. Res., 2026

Adaptive reinforcement learning for dynamic semiconductor wafer fabrication scheduling: A hybrid reward approach with online bootstrap.
Comput. Ind. Eng., 2026

2025
Smart Elderly Healthcare Services in Industry 5.0: A Survey of Key Enabling Technologies and Future Trends.
IEEE Access, 2025

2024
Intelligent Scheduling for Group Distributed Manufacturing Systems: Harnessing Deep Reinforcement Learning in Cloud-Edge Cooperation.
IEEE Trans. Emerg. Top. Comput. Intell., April, 2024

Large-Scale Dynamic Scheduling for Flexible Job-Shop With Random Arrivals of New Jobs by Hierarchical Reinforcement Learning.
IEEE Trans. Ind. Informatics, January, 2024

Dynamic pruning-based Bayesian support vector regression for reliability analysis.
Reliab. Eng. Syst. Saf., 2024

2023
Enhancing aircraft engine remaining useful life prediction via multiscale deep transfer learning with limited data.
J. Comput. Des. Eng., December, 2023

Multi-agent deep reinforcement learning for task offloading in group distributed manufacturing systems.
Eng. Appl. Artif. Intell., 2023

2022
Decomposition approaches for parallel machine scheduling of step-deteriorating jobs to minimize total tardiness and energy consumption.
Complex Intell. Syst., 2022

An End-to-end Hierarchical Reinforcement Learning Framework for Large-scale Dynamic Flexible Job-shop Scheduling Problem.
Proceedings of the International Joint Conference on Neural Networks, 2022

2021
An improved fireworks algorithm for the constrained single-row facility layout problem.
Int. J. Prod. Res., 2021

2018
Gantry crane scheduling in intermodal rail-road container terminals.
Int. J. Prod. Res., 2018

2017
Hybrid evolutionary algorithm with extreme machine learning fitness function evaluation for two-stage capacitated facility location problems.
Expert Syst. Appl., 2017

2013
Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals.
Int. J. Comput. Intell. Syst., 2013

2011
Global artificial bee colony search algorithm for numerical function optimization.
Proceedings of the Seventh International Conference on Natural Computation, 2011


  Loading...