According to our database1, Pierre Baptiste authored at least 37 papers between 1987 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Comparison of pull management policies for a divergent process with DDMRP buffers: an industrial case study.
Int. J. Prod. Res., December, 2023

Impact of the continuous and periodic assessment of a buffer replenishment on the DDMRP method.
Int. J. Prod. Res., August, 2023

Ambiguity of the definition of permutation flow shops in the presence of missing operations.
Comput. Ind. Eng., August, 2023

Visual charts produced by simulation to correlate service rate, resource utilization and DDMRP parameters.
Int. J. Prod. Res., February, 2023

Dynamical multi-parameter sizing of DDMRP buffers in finite capacity flow-shops.
Comput. Ind. Eng., 2023

2020
Scheduling job shop problems with operators with respect to the maximum lateness.
RAIRO Oper. Res., 2020

Applicability of Demand-Driven MRP in a complex manufacturing environment.
Int. J. Prod. Res., 2020

An exact dynamic programming algorithm for the precedence-constrained class sequencing problem.
Comput. Oper. Res., 2020

2019
Scheduling flow shops with operators.
Int. J. Prod. Res., 2019

2017
Improving the migrating birds optimization metaheuristic for the permutation flow shop with sequence-dependent set-up times.
Int. J. Prod. Res., 2017

Online heuristics for unloading boxes off a gravity conveyor.
Int. J. Prod. Res., 2017

FPTAS for the two identical parallel machine problem with a single operator under the free changing mode.
Eur. J. Oper. Res., 2017

An integer programming approach to scheduling the transshipment of products at cross-docks in less-than-truckload industries.
Comput. Oper. Res., 2017

2016
Sustainability assessment using fuzzy-inference technique (SAFT): A methodology toward green products.
Expert Syst. Appl., 2016

2015
A Time Driven RCCP Model with Two Levels of Planning and a Reactive Planning Approach for Tactical Project Planning.
Proceedings of the Conference on ENTERprise Information Systems/International Conference on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, 2015

2014
A sequential priority-based heuristic for scheduling material handling in a satellite cross-dock.
Comput. Ind. Eng., 2014

2013
A polynomial time algorithm for unloading boxes off a gravity conveyor.
Discret. Optim., 2013

A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level.
Comput. Oper. Res., 2013

A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations.
Comput. Oper. Res., 2013

2011
Scheduling cross docking operations under full, partial and no information on inbound arrivals.
Comput. Oper. Res., 2011

2009
Scheduling identical parallel machines and operators within a period based changing mode.
Comput. Oper. Res., 2009

2008
Application of a Cutting/Packing Method for Solving a Job Scheduling Problem in a Line of Machines.
J. Decis. Syst., 2008

2006
A contract net based intelligent agent system for solving the reactive hoist scheduling problem.
Expert Syst. Appl., 2006

2005
The simple F<sub>2</sub>/ /C<sub>max</sub> with forbidden tasks in first or last position: A problem more complex that it seems.
Eur. J. Oper. Res., 2005

2001
Multiagent Systems for the Hoist Scheduling Problem.
Proceedings of the 10th IEEE International Conference on Fuzzy Systems, 2001

A knowledge discovery process for a flexible manufacturing system.
Proceedings of 8th IEEE International Conference on Emerging Technologies and Factory Automation, 2001

2000
A New Algorithm to Select Learning Examples from Learning Data.
Proceedings of the Intelligent Data Engineering and Automated Learning, 2000

1999
A Distributed Placement Algorithm Based on Process Initiative and on a Limited Travel.
Proceedings of the International Conference on Parallel and Distributed Processing Techniques and Applications, 1999

PLATINUM: A Placement Tool Based on Process Initiative.
Proceedings of the Parallel Computing Technologies, 1999

Selection of a Relevant Feature Subset for Induction Tasks.
Proceedings of the Foundations of Intelligent Systems, 11th International Symposium, 1999

Short term production management in the context of cyclic delivery schedules.
Proceedings of the Global Production Management, 1999

1997
Multi-criteria Comparison Between Algorithmic, Constraint Logic and Specific Constraint Programming on a Real Schedulingt Problem.
Proceedings of the Third International Conference on the Practical Application of Constraint Technology, 1997

1995
Outil d'aide à l'élaboration d'ordonnancement cyclique pour les lignes de traitement de surface.
Proceedings of the JFPLC'95, 1995

1994
Sequences Constraint Solving in Constraints Logic Programming.
Proceedings of the Sixth International Conference on Tools with Artificial Intelligence, 1994

1993
Le traitement des contraintes disjonctives dans un problème d'ordonnancement : exemple du «Hoist Scheduling Problem».
Proceedings of the 2èmes Journées Francophones de Programmation Logique (JFPL 93), 1993

1992
Hoist scheduling problem: an approach based on constraint logic programming.
Proceedings of the 1992 IEEE International Conference on Robotics and Automation, 1992

1987
Generalized Petri Net Reduction Method.
IEEE Trans. Syst. Man Cybern., 1987