Qiulan Zhao
Orcid: 0000-0002-7931-6176
According to our database1,
Qiulan Zhao authored at least 21 papers
between 2013 and 2026.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2026
A note on multi-agent scheduling to minimize the total weighted number of tardy jobs.
Oper. Res. Lett., 2026
Competing multi-agent scheduling of equal-length jobs on a single machine or uniform parallel machines.
Eur. J. Oper. Res., 2026
2024
Single-machine primary-secondary scheduling with total tardiness being the primary criterion.
J. Sched., June, 2024
2022
Interactions of localized wave and dynamics analysis in generalized derivative nonlinear Schrödinger equation.
Commun. Nonlinear Sci. Numer. Simul., 2022
Appl. Math. Lett., 2022
2021
Theor. Comput. Sci., 2021
2020
J. Comb. Theory B, 2020
J. Comb. Optim., 2020
Commun. Nonlinear Sci. Numer. Simul., 2020
2019
A note on single-machine scheduling to tradeoff between the number of tardy jobs and the start time of machine.
Oper. Res. Lett., 2019
Complex., 2019
2018
2017
Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs.
Asia Pac. J. Oper. Res., 2017
2016
4OR, 2016
2013
Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption.
J. Sched., 2013