Rocío Alfaro Pozo

Orcid: 0000-0001-8214-1875

According to our database1, Rocío Alfaro Pozo authored at least 23 papers between 2011 and 2024.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Impact of limiting the ergonomic risk on the economic and productive efficiency of an assembly line.
Int. J. Prod. Res., January, 2024

2020
Mixed integer linear programming models for Flow Shop Scheduling with a demand plan of job types.
Central Eur. J. Oper. Res., 2020

2018
A case study at the Nissan Barcelona factory to minimize the ergonomic risk and its standard deviation in a mixed-model assembly line.
Prog. Artif. Intell., 2018

A GRASP algorithm for Quota sequences with minimum work overload and forced interruption of operations in a mixed-product assembly line.
Prog. Artif. Intell., 2018

An expert system to minimize operational costs in mixed-model sequencing problems with activity factor.
Expert Syst. Appl., 2018

A GRASP Algorithm to Optimize Operational Costs and Regularity of Production in Mixed-Model Sequencing Problems with Forced Interruption of Operations.
Proceedings of the Advances in Artificial Intelligence, 2018

2017
Free and regular mixed-model sequences by a linear program-assisted hybrid algorithm GRASP-LP.
Prog. Artif. Intell., 2017

A hybrid dynamic programming for solving a mixed-model sequencing problem with production mix restriction and free interruptions.
Prog. Artif. Intell., 2017

2016
Erratum to: GRASP for sequencing mixed models in an assembly line with work overload, useless time and production regularity.
Prog. Artif. Intell., 2016

GRASP for sequencing mixed models in an assembly line with work overload, useless time and production regularity.
Prog. Artif. Intell., 2016

Maximizing comfort in Assembly Lines with temporal, spatial and ergonomic attributes.
Int. J. Comput. Intell. Syst., 2016

Models for assembly line balancing by temporal, spatial and ergonomic risk attributes.
Eur. J. Oper. Res., 2016

GRASP for Minimizing the Ergonomic Risk Range in Mixed-Model Assembly Lines.
Proceedings of the Advances in Artificial Intelligence, 2016

2015
Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement.
Expert Syst. Appl., 2015

GRASP Approach to a Min-Max Problem of Ergonomic Risk in Restricted Assembly Lines.
Proceedings of the Advances in Artificial Intelligence, 2015

2013
Hybrid Procedure Based on Bounded Dynamic Programming and Linear Programming for Solving a Variant of the MMSP-W.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Extended Models for TSALBP with Ergonomic Risk Constraints.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Impact of the Production Mix Preservation on the ORV Problem.
Proceedings of the Advances in Artificial Intelligence, 2013

2012
Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant.
Expert Syst. Appl., 2012

Models for MMSP-W considering workstation dependencies: A case study of Nissan's Barcelona plant.
Eur. J. Oper. Res., 2012

Incorporating Ergonomics Factors into the TSALBP.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

Incorporating Regularity of Required Workload to the MMSP-W with Serial Workstations and Free Interruption of the Operations.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

2011
A bounded dynamic programming algorithm for the MMSP-W considering workstation dependencies and unrestricted interruption of the operations.
Proceedings of the 11th International Conference on Intelligent Systems Design and Applications, 2011


  Loading...