Ronald G. Askin

Orcid: 0000-0002-8348-448X

According to our database1, Ronald G. Askin authored at least 20 papers between 1991 and 2022.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Capacity planning and production scheduling integration: improving operational efficiency via detailed modelling.
Int. J. Prod. Res., 2022

2021
Approximations for dynamic multi-class manufacturing systems with priorities and finite buffers.
IISE Trans., 2021

2020
Demand prediction and dynamic workforce allocation to improve airport screening operations.
IISE Trans., 2020

2019
Review of supply chain configuration and design decision-making for new product.
Int. J. Prod. Res., 2019

Hub relay network design for daily driver routes.
Int. J. Prod. Res., 2019

2018
Queueing network models for analysis of nonstationary manufacturing systems.
Int. J. Prod. Res., 2018

2017
Automated lead time estimation for manufacturing networks with dynamic demand.
Proceedings of the 13th IEEE Conference on Automation Science and Engineering, 2017

2012
A Modeling Framework for Engineered Complex Adaptive Systems.
IEEE Syst. J., 2012

2011
An Integrated Optimization and Agent-Based Framework for the U.S. Power System.
Proceedings of the Complex Adaptive Systems 2011 Conference, 2011

Modeling Properties and Behavior of the US Power System as an Engineered Complex Adaptive System.
Proceedings of the Complex Adaptive Systems: Energy, 2011

2010
Machine qualification management for a semiconductor back-end facility.
Proceedings of the 2010 Winter Simulation Conference, 2010

2009
Project selection, scheduling and resource allocation with time dependent returns.
Eur. J. Oper. Res., 2009

2008
Framework for execution level capacity allocation decisions for Assembly - Test facilities using integrated optimization - simulation models.
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, 2008

2006
Evaluating the effect of information sharing and production control strategies on the performance of supply chains.
Int. J. Simul. Process. Model., 2006

Dynamic task assignment for throughput maximization with worksharing.
Eur. J. Oper. Res., 2006

2005
Forming effective worker teams with multi-functional skill requirements.
Comput. Ind. Eng., 2005

2004
A generalized SSI reliability model considering stochastic loading and strength aging degradation.
IEEE Trans. Reliab., 2004

Scheduling flexible flow lines with sequence-dependent setup times.
Eur. J. Oper. Res., 2004

1998
A general framework for comparing operating policies in manufacturing cells.
Ann. Oper. Res., 1998

1991
A note on the effect of neighborhood structure in simulated annealing.
Comput. Oper. Res., 1991


  Loading...