Sadegh Niroomand

Orcid: 0000-0001-8196-3906

According to our database1, Sadegh Niroomand authored at least 41 papers between 2011 and 2024.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
A Decision Framework Based on Integration of DEMATEL, QFD, TOPSIS and VIKOR Approaches for Fuzzy Multi-Criteria Supplier Selection Problem.
J. Uncertain Syst., March, 2024

A sustainable uncertain integrated supply chain network design and assembly line balancing problem with U-shaped assembly lines and multi-mode demand.
Soft Comput., February, 2024

2023
An optimization framework for scheduling multi-period multi-product oil pipeline systems under belief degree-based uncertain parameters.
J. Appl. Math. Comput., February, 2023

2022
Hybrid meta-heuristic algorithms for U-shaped assembly line balancing problem with equipment and worker allocations.
Soft Comput., 2022

Tabu Search Based Hybrid Meta-Heuristic Approaches for Schedule-Based Production Cost Minimization Problem for the Case of Cable Manufacturing Systems.
Informatica, 2022

A hybrid Dantzig-Wolfe decomposition algorithm for the multi-floor facility layout problem.
Expert Syst. Appl., 2022

An improved weighted principal component analysis integrated with TOPSIS approach for global financial development ranking problem of Middle East countries.
Concurr. Comput. Pract. Exp., 2022

Multi-objective location-allocation-routing problem of perishable multi-product supply chain with direct shipment and open routing possibilities under sustainability.
Concurr. Comput. Pract. Exp., 2022

2021
Hybrid artificial electric field algorithm for assembly line balancing problem with equipment model selection possibility.
Knowl. Based Syst., 2021

Modified interval EDAS approach for the multi-criteria ranking problem in banking sector of Iran.
J. Ambient Intell. Humaniz. Comput., 2021

Mathematical formulation and hybrid meta-heuristic algorithms for multiproduct oil pipeline scheduling problem with tardiness penalties.
Concurr. Comput. Pract. Exp., 2021

2020
A Hybrid Simple Additive Weighting Approach for Constrained Multicriteria Facilities Location Problem of Glass Production Industries Under Uncertainty.
IEEE Trans. Engineering Management, 2020

A belief degree-based uncertain scheme for a bi-objective two-stage green supply chain network design problem with direct shipment.
Soft Comput., 2020

An effective hybrid goal programming approach for multi-objective straight assembly line balancing problem with stochastic parameters.
Oper. Res., 2020

Meta-heuristic approaches for fixed-charge solid transportation problem in two-stage supply chain network.
Oper. Res., 2020

Solving a new cost-oriented assembly line balancing problem by classical and hybrid meta-heuristic algorithms.
Neural Comput. Appl., 2020

A closed loop supply chain network design problem with multi-mode demand satisfaction in fuzzy environment.
J. Intell. Fuzzy Syst., 2020

Uncertain location-allocation decisions for a bi-objective two-stage supply chain network design problem with environmental impacts.
Expert Syst. J. Knowl. Eng., 2020

Hybrid adaptive simplified human learning optimization algorithms for supply chain network design problem with possibility of direct shipment.
Appl. Soft Comput., 2020

Mathematical formulation and hybrid meta-heuristic solution approaches for dynamic single row facility layout problem.
Ann. Oper. Res., 2020

2019
A new effective solution method for fully intuitionistic fuzzy transportation problem.
Soft Comput., 2019

Modelling linear fractional transportation problem in belief degree - based uncertain environment.
J. Exp. Theor. Artif. Intell., 2019

An Effective Hybrid Fuzzy Programming Approach for an Entropy-Based Multi-Objective Assembly Line Balancing Problem.
Informatica, 2019

An Uncertain Multi-objective Assembly Line Balancing Problem: A Credibility-Based Fuzzy Modeling Approach.
Int. J. Fuzzy Syst., 2019

A hybrid solution approach for fuzzy multiobjective dual supplier and material selection problem of carton box production systems.
Expert Syst. J. Knowl. Eng., 2019

Adaptive meta-heuristic algorithms for flexible supply chain network design problem with different delivery modes.
Comput. Ind. Eng., 2019

2018
Simultaneous selection of material and supplier under uncertainty in carton box industries: a fuzzy possibilistic multi-criteria approach.
Soft Comput., 2018

A multi-objective based direct solution approach for linear programming with intuitionistic fuzzy parameters.
J. Intell. Fuzzy Syst., 2018

A credibility-based hybrid fuzzy programming approach for a bi-objective refueling alternative fuel vehicles problem under uncertainty.
J. Intell. Fuzzy Syst., 2018

A hybrid approach for multi-criteria emergency center location problem considering existing emergency centers with interval type data: a case study.
J. Ambient Intell. Humaniz. Comput., 2018

An Effective Solution Approach Based on Extension Principle for Fuzzy Minimal Cost Flow Problem.
Int. J. Uncertain. Fuzziness Knowl. Based Syst., 2018

Fuzzy Fractional Minimal Cost Flow Problem.
Int. J. Fuzzy Syst., 2018

A multi-objective assembly line balancing problem with worker's skill and qualification considerations in fuzzy environment.
Appl. Intell., 2018

2017
An extension principle based solution approach for shortest path problem with fuzzy arc lengths.
Oper. Res., 2017

2016
Fuzzy-based mapping algorithms to design networks-on-chip.
J. Intell. Fuzzy Syst., 2016

An Entropy-based Mathematical Formulation for Straight Assembly Line Balancing Problem.
Int. J. Strateg. Decis. Sci., 2016

Hybrid greedy algorithms for fuzzy tardiness/earliness minimisation in a special single machine scheduling problem: case study and generalisation.
Int. J. Comput. Integr. Manuf., 2016

Modeling supermarket re-layout from the owner's perspective.
Ann. Oper. Res., 2016

2015
Exact mathematical formulations and metaheuristic algorithms for production cost minimization: a case study of the cable industry.
Int. Trans. Oper. Res., 2015

Modified migrating birds optimization algorithm for closed loop layout with exact distances in flexible manufacturing systems.
Expert Syst. Appl., 2015

2011
To lay out or not to lay out?
Ann. Oper. Res., 2011


  Loading...