Scott J. Mason

Orcid: 0000-0002-8686-9609

According to our database1, Scott J. Mason authored at least 41 papers between 1996 and 2022.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2022
A multi-vehicle covering tour problem with speed optimization.
Networks, 2022

A bi-objective optimisation of post-disaster relief distribution and short-term network restoration using hybrid NSGA-II algorithm.
Int. J. Prod. Res., 2022

Stochastic programming approaches for an energy-aware lot-sizing and sequencing problem with incentive.
Int. J. Prod. Res., 2022

A Markov decision process model on dynamic routing for target surveillance.
Comput. Oper. Res., 2022

2020
Stochastic optimization for flow-shop scheduling with on-site renewable energy generation using a case in the United States.
Comput. Ind. Eng., 2020

Statistical estimation of operating reserve requirements using rolling horizon stochastic optimization.
Ann. Oper. Res., 2020

2019
Stochastic Optimization for Energy Management in Power Systems With Multiple Microgrids.
IEEE Trans. Smart Grid, 2019

Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups.
Int. J. Prod. Res., 2019

Distributionally Robust Optimization for a Resilient Transmission Grid During Geomagnetic Disturbances.
CoRR, 2019

2018
Resilient Off-Grid Microgrids: Capacity Planning and N-1 Security.
IEEE Trans. Smart Grid, 2018

Tight Piecewise Convex Relaxations for Global Optimization of Optimal Power Flow.
CoRR, 2018

On scheduling a photolithography area containing cluster tools.
Comput. Ind. Eng., 2018

2017
Assessing the Cost Impact of Multiple Transportation Modes to Enhance Sustainability in an Integrated, Two Stage, Automotive Supply Chain.
Informatics, 2017

2016
A bi-criteria hybrid metaheuristic for analysing an integrated automotive supply chain.
J. Oper. Res. Soc., 2016

Integrated cost optimization in a two-stage, automotive supply chain.
Comput. Oper. Res., 2016

Robust semiconductor production planning under yield uncertainty.
Proceedings of the Winter Simulation Conference, 2016

2015
Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting.
Comput. Oper. Res., 2015

2014
Scheduling parallel machines with single vehicle delivery.
J. Heuristics, 2014

Supply network design: Risk-averse or risk-neutral?
Comput. Ind. Eng., 2014

2013
Production Planning and Control for Semiconductor Wafer Fabrication Facilities - Modeling, Analysis, and Systems.
Operations research / computer science interfaces series 52, Springer, ISBN: 978-1-4614-4471-8, 2013

2011
A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations.
J. Sched., 2011

Multiple orders per job formation and release strategies in large-scale wafer fabs: a simulation study.
J. Simulation, 2011

2010
Integrated heuristics for scheduling multiple order jobs in a complex job shop.
Int. J. Metaheuristics, 2010

Scheduling multiple orders per job in a single machine to minimize total completion time.
Eur. J. Oper. Res., 2010

Evaluation of mixed integer programming formulations for non-preemptive parallel machine scheduling problems.
Comput. Ind. Eng., 2010

A column generation heuristic for complex job shop multiple orders per job scheduling.
Comput. Ind. Eng., 2010

2009
An integrated supply chain model with dynamic flow and replenishment requirements.
J. Simulation, 2009

Optimizing Demand Fulfillment from Test Bins.
Proceedings of the 2009 Winter Simulation Conference, 2009

2008
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities.
J. Sched., 2008

Column generation heuristics for multiple machine, multiple orders per job scheduling problems.
Ann. Oper. Res., 2008

Multiple orders per job batch scheduling with incompatible jobs.
Ann. Oper. Res., 2008

Determining an appropriate number of FOUPs in semiconductor wafer fabrication facilities.
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, 2008

2007
Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times.
Comput. Oper. Res., 2007

Multi-Objective Semiconductor Manufacturing Scheduling: A Random Keys Implementation of NSGA-II.
Proceedings of the 2007 IEEE Symposium on Computational Intelligence in Scheduling, 2007

2005
Modeling and analysis of a generic cross-docking facility.
Proceedings of the 37th Winter Simulation Conference, Orlando, FL, USA, December 4-7, 2005, 2005

2004
Simulating Transportation Practices in Multi-Indenture Multi-echelon (MIME) Systems.
Proceedings of the 36th conference on Winter simulation, 2004

2002
Semiconductor manufacturing: using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

2001
Sizing a pilot production line using simulation.
Proceedings of the 33nd conference on Winter simulation, 2001

Scheduling and dispatching: scheduling batch processing machines in complex job shops.
Proceedings of the 33nd conference on Winter simulation, 2001

2000
Semiconductor manufacturing scheduling: maximizing delivery performance in semiconductor wafer fabrication facilities.
Proceedings of the 32nd conference on Winter simulation, 2000

1996
A Comparison Study of the Logic of Four Wafer Fabrication Simulators.
Proceedings of the 28th conference on Winter simulation, 1996


  Loading...