Surendra M. Gupta

According to our database1, Surendra M. Gupta authored at least 40 papers between 1994 and 2018.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

On csauthors.net:

Bibliography

2018
A Decision Maker-Centered End-of-Life Product Recovery System for Robot Task Sequencing.
Journal of Intelligent and Robotic Systems, 2018

Modeling and Analysis of a Closed-Loop Supply Chain in Consideration of Extra Demand.
IJAT, 2018

Analysis of Product Designs for Product Recovery Using Linear Physical Programming.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

2017
Design of a Closed-Loop Supply Chain with Stochastic Product Returns.
IJAT, 2017

A holistic approach for performance evaluation using quantitative and qualitative data: A food industry case study.
Expert Syst. Appl., 2017

2016
Disassembly Sequencing Using Tabu Search.
Journal of Intelligent and Robotic Systems, 2016

A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem.
Annals OR, 2016

Base and Extended One-Dimensional Warranties Analyses for Remanufactured Products.
Proceedings of the Advances in Production Management Systems. Initiatives for a Sustainable World, 2016

2014
A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system.
European Journal of Operational Research, 2014

Quality management in product recovery using the Internet of Things: An optimization approach.
Computers in Industry, 2014

2013
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem.
Expert Syst. Appl., 2013

Optimization of a Reverse Manufacturing System with Multiple Virtual Inventories.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

2012
Optimal End-of-Life Management in Closed-Loop Supply Chains Using RFID and Sensors.
IEEE Trans. Industrial Informatics, 2012

A Robotic-Driven Disassembly Sequence Generator for End-Of-Life Electronic Products.
Journal of Intelligent and Robotic Systems, 2012

2011
Metrics and experimental data for assessing unbalanced disassembly lines.
IJMTM, 2011

2010
Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line.
Computers & Industrial Engineering, 2010

Near optimal buffer allocation in remanufacturing systems with N-policy.
Computers & Industrial Engineering, 2010

Use of sensor embedded products for end of life processing.
Proceedings of the 2010 Winter Simulation Conference, 2010

2009
Solving the disassembly-to-order problem using linear physical programming.
IJMOR, 2009

Metrics for performance measurement of a reverse/closed-loop supply chain.
IJBPSCM, 2009

A multiple objective tabu search approach for end-of-life product disassembly.
IJAOM, 2009

2008
Deterministic Search Algorithm for Sequencing and Scheduling.
Proceedings of the Metaheuristics for Scheduling in Industrial and Manufacturing Applications, 2008

A path-relinking approach for a bi-criteria disassembly sequencing problem.
Computers & OR, 2008

2007
A balancing method and genetic algorithm for disassembly line balancing.
European Journal of Operational Research, 2007

2005
Buffer allocation plan for a remanufacturing cell.
Computers & Industrial Engineering, 2005

2003
Performance evaluation of a supplier management system with stochastic variability.
IJMTM, 2003

Greedy algorithm for disassembly line scheduling.
Proceedings of the IEEE International Conference on Systems, 2003

2002
A case-based reasoning approach for automating disassembly process planning.
J. Intelligent Manufacturing, 2002

2001
Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships.
European Journal of Operational Research, 2001

2000
Production systems with interruptions, arbitrary topology and finite buffers.
Annals OR, 2000

1999
Analysis of manufacturing flow lines with unreliable machines.
Int. J. Computer Integrated Manufacturing, 1999

Expansion method for the throughput analysis of open finite manufacturing/queueing networks with N-policy.
Computers & OR, 1999

1998
Disassembly Petri net generation in the presence of XOR precedence relationships.
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, 1998

1997
A case-based reasoning approach to planning for disassembly.
J. Intelligent Manufacturing, 1997

Duality relations for queues with arrival and service control.
Computers & OR, 1997

1995
Queueing Model with State Dependent Balking and Reneging: Its Complementary and Equivalence.
SIGMETRICS Performance Evaluation Review, 1995

Interrelationship between controlling arrival and service in queueing systems.
Computers & OR, 1995

1994
Solution to complex queueing systems: a spreadsheet approach.
SIGMETRICS Performance Evaluation Review, 1994

Complementarity and equivalence in finite source queueing models with spares.
Computers & OR, 1994


  Loading...