Suresh Chand

According to our database1, Suresh Chand
  • authored at least 20 papers between 1981 and 2014.
  • has a "Dijkstra number"2 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Other 

Links

On csauthors.net:

Bibliography

2014
An empirical investigation into factors affecting patient cancellations and no-shows at outpatient clinics.
Decision Support Systems, 2014

2012
Global Experiential Projects with a Manufacturer in India: Insights from Five Years of Experience.
INFORMS Trans. Education, 2012

2009
Managing Inventory Over a Short Season: Models with Two Procurement Opportunities.
Manufacturing & Service Operations Management, 2009

2008
Batch sizing under learning and forgetting: Steady state characteristics for the constant demand case.
Oper. Res. Lett., 2008

Learning and forgetting effects on a group scheduling problem.
European Journal of Operational Research, 2008

Synthesis and characterization of some 5-coordinated aluminum-8-hydroxyquinoline derivatives for OLED applications.
Displays, 2008

2007
Estimating the limits for statistical process control charts: A direct method improving upon the bootstrap.
European Journal of Operational Research, 2007

2003
The single-item lot-sizing problem with immediate lost sales.
European Journal of Operational Research, 2003

2002
Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography.
Manufacturing & Service Operations Management, 2002

A Note on optimal allocation of work in stochastic assembly systems.
European Journal of Operational Research, 2002

2001
A Comparison of U-Line and Straight-Line Performances Under Stochastic Task Times.
Manufacturing & Service Operations Management, 2001

2000
A model for parallel machine replacement with capacity expansion.
European Journal of Operational Research, 2000

1999
The Changeover Scheduling Problem with Time and Cost Considerations: Analytical Results and a Forward Algorithm.
Operations Research, 1999

1997
Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates.
Annals OR, 1997

1996
Capacity Allocation for Dynamic Process Improvement with Quality and Demand Considerations.
Operations Research, 1996

An iterative heuristic for the single machine dynamic total completion time scheduling problem.
Computers & OR, 1996

1992
A Single Machine Model for Determination of Optimal Due Dates and Sequence.
Operations Research, 1992

1990
Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models.
Operations Research, 1990

A Dynamic Lot Sizing Model with Learning in Setups.
Operations Research, 1990

1981
Multiple Finite Production Rate Dynamic Lot Size Inventory Models.
Operations Research, 1981


  Loading...