Wei Li

Orcid: 0000-0001-8524-8977

Affiliations:
  • University of Kentucky, Department of Mechanical Engineering, Lexington, KY, USA
  • University of Calgary, Department of Mechanical and Manufacturing Engineering, AB, Canada (PhD 2011)


According to our database1, Wei Li authored at least 9 papers between 2008 and 2020.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2020
Trade-off balancing between maximum and total completion times for no-wait flow shop production.
Int. J. Prod. Res., 2020

2019
Trade-off balancing in scheduling for flow shop production and perioperative processes.
Eur. J. Oper. Res., 2019

2017
A lever concept integrated with simple rules for flow shop scheduling.
Int. J. Prod. Res., 2017

The effect of work content imbalance and its interaction with scheduling method on sequential flow line performance.
Int. J. Prod. Res., 2017

An effective and efficient heuristic for no-wait flow shop production to minimize total completion time.
Comput. Ind. Eng., 2017

2011
An expert system for an emergency response management in Networked Safe Service Systems.
Expert Syst. Appl., 2011

An efficient heuristic for adaptive production scheduling and control in one-of-a-kind production.
Comput. Oper. Res., 2011

2010
Optimal resource allocation for hybrid flow shop in one-of-a-kind production.
Int. J. Comput. Integr. Manuf., 2010

2008
A disaster response management system based on the control systems technology.
Int. J. Crit. Infrastructures, 2008


  Loading...