Weizhang Liang

Orcid: 0000-0003-3172-6288

According to our database1, Weizhang Liang authored at least 11 papers between 2017 and 2022.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Evaluation of Point-Pillar Stability Using a Hesitant Fuzzy GA-WDBA Approach.
Int. J. Fuzzy Syst., 2022

2021
A hybrid TODIM approach with unknown weight information for the performance evaluation of cleaner production.
Comput. Appl. Math., 2021

2020
Selection of mine development scheme based on similarity measure under fuzzy environment.
Neural Comput. Appl., 2020

Hybrid PSO-WDBA method for the site selection of tailings pond.
Comput. Ind. Eng., 2020

Likelihood-based hybrid ORESTE method for evaluating the thermal comfort in underground mines.
Appl. Soft Comput., 2020

2019
Selecting the optimal mining method with extended multi-objective optimization by ratio analysis plus the full multiplicative form (MULTIMOORA) approach.
Neural Comput. Appl., 2019

Optimization of roadway support schemes with likelihood-based MABAC method.
Appl. Soft Comput., 2019

Performance Evaluation of Green Mine Using a Combined Multi-Criteria Decision Making Method With Picture Fuzzy Information.
IEEE Access, 2019

2018
Selecting the Optimal Mine Ventilation System via a Decision Making Framework under Hesitant Linguistic Environment.
Symmetry, 2018

An Integrated EDAS-ELECTRE Method With Picture Fuzzy Information for Cleaner Production Evaluation in Gold Mines.
IEEE Access, 2018

2017
Evaluating Investment Risks of Metallic Mines Using an Extended TOPSIS Method with Linguistic Neutrosophic Numbers.
Symmetry, 2017


  Loading...