Yarong Chen

Orcid: 0000-0002-2989-3979

According to our database1, Yarong Chen authored at least 13 papers between 2018 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
A multi-objective hybrid evolutionary search algorithm for parallel production line balancing problem including disassembly and assembly tasks.
Int. Trans. Oper. Res., November, 2023

An improved spider monkey optimization algorithm for multi-objective planning and scheduling problems of PCB assembly line.
Expert Syst. Appl., November, 2023

Video Recommendation Method Based on Deep Learning of Group Evaluation Behavior Sequences.
Int. J. Pattern Recognit. Artif. Intell., February, 2023

Spectrum Efficient Resource Allocation of NOMA Downlink System With MMSE Receiver.
IEEE Access, 2023

An Evaluation of Mathematical Programming and Lower-Bound Methods for Hybrid Flow Shop Problems With a Makespan Criterion.
IEEE Access, 2023

Modulation recognition technology based on ResNet50.
Proceedings of the 6th International Conference on Signal Processing and Machine Learning, 2023

2022
A refined order release method for achieving robustness of non-repetitive dynamic manufacturing system performance.
Ann. Oper. Res., 2022

Single Machine Scheduling Problem With a Weight-Modifying-Activity to Minimize the Total Weighted Completion Time.
IEEE Access, 2022

2021
Automatic Modulation Recognition for Secondary Modulated Signals.
IEEE Wirel. Commun. Lett., 2021

2019
Minimizing the Total Weighted Completion Time of a Single Machine With Flexible Maintenance.
IEEE Access, 2019

Scheduling Jobs on a Single Machine With Dirt Cleaning Consideration to Minimize Total Completion Time.
IEEE Access, 2019

2018
Two-dimensional optimization mechanism and method for on-demand supply of manufacturing cloud service.
Comput. Ind. Eng., 2018

Minimizing Total Weighted Completion Time on a Single Machine Scheduling Problem with Resumable Jobs and Flexible Maintenance.
Proceedings of the 4th International Conference on Robotics and Artificial Intelligence, 2018


  Loading...