Zikai Zhang

Orcid: 0000-0001-5621-1411

Affiliations:
  • Wuhan University of Science and Technology, Wuhan, China


According to our database1, Zikai Zhang authored at least 43 papers between 2018 and 2026.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2026
A new graphical modelling and nearest neighborhood search algorithm for resource-constrained project scheduling problem with multi-skill staff.
Expert Syst. Appl., 2026

2025
An effective cooperative coevolutionary algorithm with global and local-oriented cooperative mechanisms for multi-objective hybrid flowshop lot-streaming scheduling with limited and flexible sub-lots.
Swarm Evol. Comput., 2025

A matheuristic-based self-learning approach for distributed heterogeneous assembly flowshop scheduling with multiple assembly factories and make-to-order delivery.
Swarm Evol. Comput., 2025

A matheuristic-based self-learning evolutionary algorithm for lot streaming hybrid flow shop group scheduling with limited auxiliary modules.
Swarm Evol. Comput., 2025

A novel disjunctive-graph-based meta-heuristic approach for multi-objective resource-constrained project scheduling problem with multi-skilled staff.
Swarm Evol. Comput., 2025

A robust counterpart model and matheuristic-oriented evolutionary algorithm for evaluating energy consumption of project scheduling with uncertainty.
Swarm Evol. Comput., 2025

Lightweight bi-level optimization algorithm for synchronized scheduling of production and transportation in a reconfigurable flexible job shop.
Swarm Evol. Comput., 2025

Matheuristic co-evolutionary algorithm for solving the integrated processing and transportation scheduling problem with processing-transportation composite robots.
J. Comput. Des. Eng., 2025

A Q-learning-based multi-population algorithm for multi-objective distributed heterogeneous assembly no-idle flowshop scheduling with batch delivery.
Expert Syst. Appl., 2025

Balancing and scheduling human-robot collaborative assembly lines with heterogeneous robots and limited resources: Constraint programming approach and fruit fly optimization algorithm.
Comput. Ind. Eng., 2025

Agent-based collaborative model for forecasting large-scale intermittent spare parts in smart manufacturing industry.
Comput. Ind. Eng., 2025

A Q-learning-oriented multi-objective teaching-learning-based optimization algorithm for balancing U-shaped disassembly lines.
Appl. Soft Comput., 2025

2024
A Knowledge-Assisted Variable Neighborhood Search for Two-Sided Assembly Line Balancing Considering Preventive Maintenance Scenarios.
IEEE Trans. Syst. Man Cybern. Syst., November, 2024

Reinforcement Learning-Based Multiobjective Evolutionary Algorithm for Mixed-Model Multimanned Assembly Line Balancing Under Uncertain Demand.
IEEE Trans. Cybern., May, 2024

A multi-objective co-evolutionary algorithm for energy and cost-oriented mixed-model assembly line balancing with multi-skilled workers.
Expert Syst. Appl., February, 2024

A matheuristic-based multi-objective evolutionary algorithm for flexible assembly jobs shop scheduling problem in cellular manufacture.
Swarm Evol. Comput., 2024

A self-learning knowledge-based MOEA/D for distributed heterogeneous assembly permutation flowshop scheduling with batch delivery.
Knowl. Based Syst., 2024

Matheuristic and learning-oriented multi-objective artificial bee colony algorithm for energy-aware flexible assembly job shop scheduling problem.
Eng. Appl. Artif. Intell., 2024

A matheuristic-oriented iterated greedy algorithm for multi-mode resource-constrained project scheduling problem under uncertainty.
Comput. Ind. Eng., 2024

Flexible assembly job shop scheduling problem considering reconfigurable machine: A cooperative co-evolutionary matheuristic algorithm.
Appl. Soft Comput., 2024

2023
Models and algorithms for U-shaped assembly line balancing problem with collaborative robots.
Soft Comput., July, 2023

Robust mixed-model assembly line balancing and sequencing problem considering preventive maintenance scenarios with interval processing times.
Swarm Evol. Comput., March, 2023

Robust scheduling of EMU first-level maintenance in a stub-end depot under stochastic uncertainties.
Eng. Appl. Artif. Intell., 2023

2022
An improved multi-objective multifactorial evolutionary algorithm for assembly line balancing problem considering regular production and preventive maintenance scenarios.
Swarm Evol. Comput., 2022

Multi-objective Q-learning-based hyper-heuristic with Bi-criteria selection for energy-aware mixed shop scheduling.
Swarm Evol. Comput., 2022

An improved preference-based variable neighborhood search algorithm with <i>ar</i>-dominance for assembly line balancing considering preventive maintenance scenarios.
Eng. Appl. Artif. Intell., 2022

Robust assembly line balancing problem considering preventive maintenance scenarios with interval processing time.
Eng. Appl. Artif. Intell., 2022

Mixed-model assembly line balancing problem considering preventive maintenance scenarios: MILP model and cooperative co-evolutionary algorithm.
Appl. Soft Comput., 2022

2021
Data mining for fast and accurate makespan estimation in machining workshops.
J. Intell. Manuf., 2021

An enhanced multi-objective JAYA algorithm for U-shaped assembly line balancing considering preventive maintenance scenarios.
Int. J. Prod. Res., 2021

Solving multi-objective model of assembly line balancing considering preventive maintenance scenarios using heuristic and grey wolf optimizer algorithm.
Eng. Appl. Artif. Intell., 2021

Integrating flexible preventive maintenance activities into two-stage assembly flow shop scheduling with multiple assembly machines.
Comput. Ind. Eng., 2021

Integration of balancing and preventive maintenance in straight and U-shaped resource-dependent assembly lines: MILP model and memetic algorithm.
Appl. Soft Comput., 2021

A robust MILP and gene expression programming based on heuristic rules for mixed-model multi-manned assembly line balancing.
Appl. Soft Comput., 2021

2020
Branch, bound and remember algorithm for two-sided assembly line balancing problem.
Eur. J. Oper. Res., 2020

Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: A multi-objective approach.
Comput. Oper. Res., 2020

Multi-manned assembly line balancing with time and space constraints: A MILP model and memetic ant colony system.
Comput. Ind. Eng., 2020

An Improved Lexicographical Whale Optimization Algorithm for the Type-II Assembly Line Balancing Problem Considering Preventive Maintenance Scenarios.
IEEE Access, 2020

Energy-Efficient Integration Optimization of Production Scheduling and Ladle Dispatching in Steelmaking Plants.
IEEE Access, 2020

2019
Enhanced migrating birds optimization algorithm for U-shaped assembly line balancing problems with workers assignment.
Neural Comput. Appl., 2019

Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problems.
Int. J. Prod. Res., 2019

Iterated local search method and mathematical model for sequence-dependent U-shaped disassembly line balancing problem.
Comput. Ind. Eng., 2019

2018
Branch, bound and remember algorithm for U-shaped assembly line balancing problem.
Comput. Ind. Eng., 2018


  Loading...