Álvaro García-Sánchez

Orcid: 0000-0001-5774-1430

According to our database1, Álvaro García-Sánchez authored at least 18 papers between 2007 and 2026.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book  In proceedings  Article  PhD thesis  Dataset  Other 

Links

Online presence:

On csauthors.net:

Bibliography

2026
On the Use of Biased-Randomized Transformers as Data-Driven Heuristics for Agile Optimization.
Inf., 2026

2025
Correction to: MILP and PSO approaches for solving a hydropower reservoirs intraday economic optimization problem.
Central Eur. J. Oper. Res., December, 2025

MILP and PSO approaches for solving a hydropower reservoirs intraday economic optimization problem.
Central Eur. J. Oper. Res., December, 2025

gymfolio: A Reinforcement learning environment for Portfolio Optimization in Python.
SoftwareX, 2025

Solving Combinatorial Optimization Problems with Decision Transformers.
Proceedings of the Decision Sciences, 2025

2024
Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective.
Ann. Oper. Res., July, 2024

A Systematic Approach to Portfolio Optimization: A Comparative Study of Reinforcement Learning Agents, Market Signals, and Investment Horizons.
Algorithms, 2024

Intraday Multireservoir Hydropower Optimization with Alternative Deep Reinforcement Learning Configurations.
Proceedings of the Decision Sciences, 2024

2019
Universidad Politécnica de Madrid Uses Integer Programming for Scheduling Weekly Assessment Activities.
INFORMS J. Appl. Anal., 2019

2018
Flexible Job Shop Scheduling With Operators in Aeronautical Manufacturing: A Case Study.
IEEE Access, 2018

2017
Analysis of the Robustness of Production Scheduling in Aeronautical Manufacturing Using Simulation: A Case Study.
Proceedings of the Product Lifecycle Management and the Industry of the Future, 2017

2016
Combining Monte Carlo simulation with heuristics to solve a rich and real-life multi-depot vehicle routing problem.
Proceedings of the Winter Simulation Conference, 2016

2014
Red Eléctrica de España Uses Integer Programming for Annual Salary Revisions.
Interfaces, 2014

2013
An extended rolling stock problem with empty trains timetabling through a heuristic approach.
OR Insight, 2013

2011
Discrete-Event Simulation Models for Assessing Incidents in Railway Systems.
Int. J. Inf. Syst. Supply Chain Manag., 2011

2010
A conceptual model for integrating strategic supply management into the supply chain.
Int. J. Manuf. Technol. Manag., 2010

2008
Combining Simulation and Tabu Search for Oil-derivatives Pipeline Scheduling.
Proceedings of the Metaheuristics for Scheduling in Industrial and Manufacturing Applications, 2008

2007
Multi-Commodity Pipeline Scheduling. A Tabu Search Approach.
Proceedings of the 2007 International Conference on Artificial Intelligence, 2007


  Loading...