Alexandre Dolgui

Orcid: 0000-0003-0527-4716

Affiliations:
  • IMT Atlantique, Nantes, France


According to our database1, Alexandre Dolgui authored at least 248 papers between 1997 and 2024.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
The impacts of digital technologies on coping with the COVID-19 pandemic in the manufacturing industry: a systematic literature review.
Int. J. Prod. Res., March, 2024

Adaptive robust optimization for lot-sizing under yield uncertainty.
Eur. J. Oper. Res., March, 2024

Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration.
Int. J. Prod. Res., February, 2024

Scheduling in Industrial environment toward future: insights from Jean-Marie Proth.
Int. J. Prod. Res., January, 2024

Production planning with flexible manufacturing systems under demand uncertainty.
Int. J. Prod. Res., January, 2024

Special issue in memory of Dr. Jean-Marie Proth (7.12.1938-17.06.2021).
Int. J. Prod. Res., January, 2024

An exact method for machining lines design with equipment selection and line balancing.
Int. J. Prod. Res., January, 2024

2023
Metaverse supply chain and operations management.
Int. J. Prod. Res., December, 2023

Fair-split distribution of multi-dose vaccines with prioritized age groups and dynamic demand: The case study of COVID-19.
Eur. J. Oper. Res., November, 2023

A state-of-the-art on production planning in Industry 4.0.
Int. J. Prod. Res., October, 2023

Achieving carbon neutrality via supply chain management: position paper and editorial for IJPR special issue.
Int. J. Prod. Res., September, 2023

MILP model for fleet and charging infrastructure decisions for fast-charging city electric bus services.
Comput. Ind. Eng., August, 2023

Toward supply chain viability theory: from lessons learned through COVID-19 pandemic to viable ecosystems.
Int. J. Prod. Res., April, 2023

The ASSISTANT project: AI for high level decisions in manufacturing.
Int. J. Prod. Res., April, 2023

In-house versus outsourcing collection in a closed-loop supply chain with remanufacturing technology development.
Int. J. Prod. Res., March, 2023

Design of a robust waste recycling network integrating social and environmental pillars of sustainability.
Comput. Ind. Eng., February, 2023

A decision support method for credit risk based on the dynamic Bayesian network.
Ind. Manag. Data Syst., 2023

Robust optimization for lot-sizing problems under yield uncertainty.
Comput. Oper. Res., 2023

2022
On lower and upper bounds for single machine parallel batch scheduling.
Optim. Lett., 2022

Applying integrated Blockchain and Big Data technologies to improve supply chain traceability and information sharing in the textile sector.
J. Ind. Inf. Integr., 2022

Big data analytics in production and distribution management.
Int. J. Prod. Res., 2022

A decade of progress in supply chain risk management: risk typology, emerging topics, and research collaborators.
Int. J. Prod. Res., 2022

Optimal trade credit coordination policy in dual-channel supply chain with consumer transfer.
Int. J. Prod. Res., 2022

The shortage economy and its implications for supply chain and operations management.
Int. J. Prod. Res., 2022

Integrated stochastic disassembly line balancing and planning problem with machine specificity.
Int. J. Prod. Res., 2022

Design and management of assembly systems 4.0: systematic literature review and research agenda.
Int. J. Prod. Res., 2022

5G in digital supply chain and operations management: fostering flexibility, end-to-end connectivity and real-time visibility through internet-of-everything.
Int. J. Prod. Res., 2022

Editorial Board contributions celebrating the 60th Anniversary of IJPR: Part 3.
Int. J. Prod. Res., 2022

Editorial board contributions celebrating the 60th anniversary of IJPR: parts 1 and 2.
Int. J. Prod. Res., 2022

Financing with preferential credit to coordinate the capital-constraint supply chain.
Int. J. Prod. Res., 2022

Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times.
Eur. J. Oper. Res., 2022

Solving robust bin-packing problems with a branch-and-price approach.
Eur. J. Oper. Res., 2022

Stability factor for robust balancing of simple assembly lines under uncertainty.
Discret. Appl. Math., 2022

Minimizing task reassignments under balancing multi-product reconfigurable manufacturing lines.
Comput. Ind. Eng., 2022

Impacts of epidemic outbreaks on supply chains: mapping a research agenda amid the COVID-19 pandemic through a structured literature review.
Ann. Oper. Res., 2022

Integrated detection of disruption scenarios, the ripple effect dispersal and recovery paths in supply chains.
Ann. Oper. Res., 2022

OR and analytics for digital, resilient, and sustainable manufacturing 4.0.
Ann. Oper. Res., 2022

An Automated Smart Production with System Reliability Under a Leader-Follower Strategy of Supply Chain Management.
Proceedings of the Advances in Production Management Systems. Smart Manufacturing and Logistics Systems: Turning Ideas into Action, 2022

2021
Reconfigurable manufacturing systems from an optimisation perspective: a focused review of literature.
Int. J. Prod. Res., 2021

The supply chain effects on order strategy of cross-shareholdings.
Int. J. Prod. Res., 2021

Machine learning in manufacturing and industry 4.0 applications.
Int. J. Prod. Res., 2021

CF-NN: a novel decision support model for borrower identification on the peer-to-peer lending platform.
Int. J. Prod. Res., 2021

Service-oriented bi-objective robust collection-disassembly problem with equipment selection.
Int. J. Prod. Res., 2021

Researchers' perspectives on Industry 4.0: multi-disciplinary analysis and opportunities for operations management.
Int. J. Prod. Res., 2021

Workforce reconfiguration strategies in manufacturing systems: a state of the art.
Int. J. Prod. Res., 2021

Ripple effect and supply chain disruption management: new trends and research directions.
Int. J. Prod. Res., 2021

Financing the newsvendor with preferential credit: bank vs. manufacturer.
Int. J. Prod. Res., 2021

Pricing strategy for B&M store in a dual-channel supply chain based on hotelling model.
Int. J. Prod. Res., 2021

A control approach to scheduling flexibly configurable jobs with dynamic structural-logical constraints.
IISE Trans., 2021

Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions.
Eur. J. Oper. Res., 2021

A two-phase sequential approach to design bioenergy supply chains under uncertainty and social concerns.
Comput. Chem. Eng., 2021

Genetic algorithm and Monte Carlo simulation for a stochastic capacitated disassembly lot-sizing problem under random lead times.
Comput. Ind. Eng., 2021

A Model for a Multi-level Disassembly System Under Random Disassembly Lead Times.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Designing Bioenergy Supply Chains Under Social Constraints.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Integrated Workforce Allocation and Scheduling in a Reconfigurable Manufacturing System Considering Cloud Manufacturing.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Optimization for Lot-Sizing Problems Under Uncertainty: A Data-Driven Perspective.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

A Digital Twin-Driven Methodology for Material Resource Planning Under Uncertainties.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

A Robust Data Driven Approach to Supply Planning.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Digital Twin Framework for Reconfigurable Manufacturing Systems: Challenges and Requirements.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Multi-period Multi-sourcing Supply Planning with Stochastic Lead-Times, Quantity-Dependent Pricing, and Delivery Flexibility Costs.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Mathematical Model for Processing Multiple Parts on Multi-positional Reconfigurable Machines with Turrets.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Advancing Circular Economy: Research Roadmap for Circular Integrated Production Systems.
Proceedings of the Smart and Sustainable Collaborative Networks 4.0, 2021

The adaptive robust lot-sizing problem with backorders under demand uncertainty.
Proceedings of the 17th IEEE International Conference on Automation Science and Engineering, 2021

2020
Option contracts for online celebrities as retailers in supply chains.
Int. J. Prod. Res., 2020

Blockchain in transport and logistics - paradigms and transitions.
Int. J. Prod. Res., 2020

Ripple effect quantification by supplier risk exposure assessment.
Int. J. Prod. Res., 2020

Viability of intertwined supply networks: extending the supply chain resilience angles towards survivability. A position paper motivated by COVID-19 outbreak.
Int. J. Prod. Res., 2020

Ripple effect modelling of supplier disruption: integrated Markov chain and dynamic Bayesian network approach.
Int. J. Prod. Res., 2020

Optimisation of the aggregation and execution rates for intersecting operation sets: an example of machining process design.
Int. J. Prod. Res., 2020

Reconfigurable supply chain: the X-network.
Int. J. Prod. Res., 2020

Does the ripple effect influence the bullwhip effect? An integrated analysis of structural and operational dynamics in the supply chain.
Int. J. Prod. Res., 2020

Blockchain-oriented dynamic modelling of smart contract design and execution in the supply chain.
Int. J. Prod. Res., 2020

Optimal cost design of flow lines with reconfigurable machines for batch production.
Int. J. Prod. Res., 2020

Integrated production planning and quality control for linear production systems under uncertainties of cycle time and finished product quality.
Int. J. Prod. Res., 2020

Three parallel task assignment problems with shared resources.
IISE Trans., 2020

A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead times.
Comput. Ind. Eng., 2020

Operations management issues in design and control of hybrid human-robot collaborative manufacturing systems: a survey.
Annu. Rev. Control., 2020

Manufacturing modelling, management and control: IFAC TC 5.2 past, present and future.
Annu. Rev. Control., 2020

Structural-Parametric Optimization of a Complex of Intersecting Sets of Operations under Nonstationary Demand.
Autom. Remote. Control., 2020

A Stochastic Model for a Two-Level Disassembly Lot-Sizing Problem Under Random Lead Time.
Proceedings of the Advances in Production Management Systems. The Path to Digital Transformation and Innovation of Production Management Systems, 2020

The Impact of Dynamic Tasks Assignment in Paced Mixed-Model Assembly Line with Moving Workers.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020

A Digital Twin Modular Framework for Reconfigurable Manufacturing Systems.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020

Diagnosis on Energy and Sustainability of Reconfigurable Manufacturing System (RMS) Design: A Bi-level Decomposition Approach.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020

2019
User activity measurement in rating-based online-to-offline (O2O) service recommendation.
Inf. Sci., 2019

The impact of digital technology and Industry 4.0 on the ripple effect and supply chain risk analytics.
Int. J. Prod. Res., 2019

Low-Certainty-Need (LCN) supply chains: a new perspective in managing disruption risks and resilience.
Int. J. Prod. Res., 2019

Sample average approximation for multi-vehicle collection-disassembly problem under uncertainty.
Int. J. Prod. Res., 2019

Optimal maintenance plan for two-level assembly system and risk study of machine failure.
Int. J. Prod. Res., 2019

Scheduling in production, supply chain and Industry 4.0 systems by optimal control: fundamentals, state-of-the-art and applications.
Int. J. Prod. Res., 2019

Selected surveys on cutting edge problems in Production Research.
Int. J. Prod. Res., 2019

The stability radius of an optimal line balance with maximum efficiency for a simple assembly line.
Eur. J. Oper. Res., 2019

Minimizing the number of workers in a paced mixed-model assembly line.
Eur. J. Oper. Res., 2019

Decision Support System for Joint Product Design and Reconfiguration of Production Systems.
Proceedings of the Advances in Production Management Systems. Production Management for the Factory of the Future, 2019

2018
Hybrid Fuzzy-Probabilistic Approach to Supply Chain Resilience Assessment.
IEEE Trans. Engineering Management, 2018

General parametric scheme for the online uniform machine scheduling problem with two different speeds.
Inf. Process. Lett., 2018

Recent advances and opportunities in sustainable food supply chain: a model-oriented review.
Int. J. Prod. Res., 2018

Optimal due date quoting for a risk-averse decision-maker under CVaR.
Int. J. Prod. Res., 2018

Scheduling of recovery actions in the supply chain with resilience analysis considerations.
Int. J. Prod. Res., 2018

Optimising integrated inventory policy for perishable items in a multi-stage supply chain.
Int. J. Prod. Res., 2018

Ripple effect in the supply chain: an analysis and recent literature.
Int. J. Prod. Res., 2018

Leading scholars in Production Research for the 55th volume anniversary of IJPR.
Int. J. Prod. Res., 2018

Dynamic optimisation for highly agile supply chains in e-procurement context.
Int. J. Prod. Res., 2018

Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty.
Int. J. Prod. Res., 2018

Design for manufacturing and assembly/disassembly: joint design of products and production systems.
Int. J. Prod. Res., 2018

Optimal order release dates for two-level assembly systems with stochastic lead times at each level.
Int. J. Prod. Res., 2018

Optimal workforce assignment to operations of a paced assembly line.
Eur. J. Oper. Res., 2018

A survey on control theory applications to operational systems, supply chain management, and Industry 4.0.
Annu. Rev. Control., 2018

Optimal Control Algorithms and Their Analysis for Short-Term Scheduling in Manufacturing Systems.
Algorithms, 2018

Simulation Vs. Optimization Approaches to Ripple Effect Modelling in the Supply Chain.
Proceedings of the Dynamics in Logistics, 2018

2017
Knapsack problem with objective value gaps.
Optim. Lett., 2017

Using common weights and efficiency invariance principles for resource allocation and target setting.
Int. J. Prod. Res., 2017

Literature review on disruption recovery in the supply chain.
Int. J. Prod. Res., 2017

55th anniversary of Production Research.
Int. J. Prod. Res., 2017

Decision support for design of reconfigurable rotary machining systems for family part production.
Int. J. Prod. Res., 2017

Integrated process planning and system configuration for mixed-model machining on rotary transfer machine.
Int. J. Comput. Integr. Manuf., 2017

Artificial intelligence in engineering risk analytics.
Eng. Appl. Artif. Intell., 2017

Minimizing the number of stations and station activation costs for a production line.
Comput. Oper. Res., 2017

A multi-period inventory transportation model for tactical planning of food grain supply chain.
Comput. Ind. Eng., 2017

An efficient two-phase iterative heuristic for Collection-Disassembly problem.
Comput. Ind. Eng., 2017

Analysis of a multicriterial buffer capacity optimization problem for a production line.
Autom. Remote. Control., 2017

A Dynamic Approach to Multi-stage Job Shop Scheduling in an Industry 4.0-Based Flexible Assembly System.
Proceedings of the Advances in Production Management Systems. The Path to Intelligent, Collaborative and Sustainable Manufacturing, 2017

2016
Towards green automated production line with rotary transfer and turrets: a multi-objective approach using a binary scatter tabu search procedure.
Int. J. Comput. Integr. Manuf., 2016

Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations.
Discret. Appl. Math., 2016

Robust dynamic schedule coordination control in the supply chain.
Comput. Ind. Eng., 2016

A new effective dynamic program for an investment optimization problem.
Autom. Remote. Control., 2016

Combinatorial Design of Machines and Machining Lines - New Application Domain for OR.
Proceedings of 5th the International Conference on Operations Research and Enterprise Systems (ICORES 2016), 2016

2015
Second order conic approximation for disassembly line design with joint probabilistic constraints.
Eur. J. Oper. Res., 2015

A decomposition based solution algorithm for U-type assembly line balancing with interval data.
Comput. Oper. Res., 2015

Enumerations and stability analysis of feasible and optimal line balances for simple assembly lines.
Comput. Ind. Eng., 2015

Two-station single-track railway scheduling problem with trains of equal speed.
Comput. Ind. Eng., 2015

Cooperative control in production and logistics.
Annu. Rev. Control., 2015

A review of cost and profit oriented line design and balancing problems and solution approaches.
Annu. Rev. Control., 2015

2014
Two-dedicated-machine scheduling problem with precedence relations to minimize makespan.
Optim. Lett., 2014

Efficiency evaluation model with constraint resource: an application to banking operations.
J. Oper. Res. Soc., 2014

A Graphical Approach to Solve an Investment Optimization Problem.
J. Math. Model. Algorithms Oper. Res., 2014

A sample average approximation method for disassembly line balancing problem under uncertainty.
Comput. Oper. Res., 2014

Integrated Procurement-Disassembly Problem.
Proceedings of the Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World, 2014

Reducing the Research Space of Possible Order Release Dates for Multi-level Assembly Systems under Stochastic Lead Times.
Proceedings of the Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World, 2014

Dealing with Variations for a Supplier Selection Problem in a Flexible Supply Chain - A Dynamic Optimization Approach.
Proceedings of the ICORES 2014, 2014

2013
Reconfiguration of Machining Transfer Lines.
Proceedings of the Service Orientation in Holonic and Multi Agent Manufacturing and Robotics, 2013

A branch and bound algorithm for the response time variability problem.
J. Sched., 2013

Robust balancing of straight assembly lines with interval task times.
J. Oper. Res. Soc., 2013

Complexity of Buffer Capacity Allocation Problems for Production Lines with Unreliable Machines.
J. Math. Model. Algorithms Oper. Res., 2013

Complex Optimization Problems in Locational Analysis and Scheduling.
J. Math. Model. Algorithms Oper. Res., 2013

Equipment Location in Machining Transfer Lines with Multi-spindle Heads.
J. Math. Model. Algorithms Oper. Res., 2013

Stability measure for a generalized assembly line balancing problem.
Discret. Appl. Math., 2013

Lot-sizing on a single imperfect machine: ILP models and FPTAS extensions.
Comput. Ind. Eng., 2013

Assembly line balancing under uncertainty: Robust optimization models and exact solution method.
Comput. Ind. Eng., 2013

Genetic algorithm for balancing reconfigurable machining lines.
Comput. Ind. Eng., 2013

Stable Optimal Line Balances with a Fixed Set of the Working Stations.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Optimization of Multi-Tool Cutting Modes in Multi-Item Batch Manufacturing System.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Application of Control Theoretic Tools to Supply Chain Disruptions Management.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Integration of Additional Purchase Cost to Reduce the Lead Time Uncertainty for One Level Assembly System.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

A Graphical Approach for Solving Single Machine Scheduling Problems Approximately.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Assembly Line Balancing: Conventional Methods and Extensions.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

A Transfer Line Design Problem with Setup Times and Costs.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

L-Shaped Algorithm for Stochastic Disassembly Line Balancing Problem.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Parallel Machining of Multiple Parts on Rotary Transfer Machines with Turrets.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Integrated Decision Making in Flow Line Balancing.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Mathematical Model for Supply Planning of Multi-Level Assembly Systems with Stochastic Lead Times.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Supply Planning and Inventory Control under Lead Time Uncertainty: A Review.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

An Exact Method for the Assembly Line Re-balancing Problem.
Proceedings of the Advances in Production Management Systems. Sustainable Production and Service Supply Chains, 2013

Chance Constrained Programming Model for Stochastic Profit-Oriented Disassembly Line Balancing in the Presence of Hazardous Parts.
Proceedings of the Advances in Production Management Systems. Sustainable Production and Service Supply Chains, 2013

A decomposition method for stochastic partial disassembly line balancing with profit maximization.
Proceedings of the 2013 IEEE International Conference on Automation Science and Engineering, 2013

2012
Guest Editorial Special Section on Radio Frequency Identification.
IEEE Trans. Ind. Informatics, 2012

Scheduling with due date assignment under special conditions on job processing.
J. Sched., 2012

Modelling transfer line design problem via a set partitioning problem.
Optim. Lett., 2012

Line configuration to minimize setup costs.
Math. Comput. Model., 2012

Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint.
J. Intell. Manuf., 2012

Multi-product sequencing and lot-sizing under uncertainties: A memetic algorithm.
Eng. Appl. Artif. Intell., 2012

Scenario based robust line balancing: Computational complexity.
Discret. Appl. Math., 2012

Single machine scheduling with precedence constraints and positionally dependent processing times.
Comput. Oper. Res., 2012

Algorithms and implementation of a set partitioning approach for modular machining line design.
Comput. Oper. Res., 2012

Reduction approaches for a generalized line balancing problem.
Comput. Oper. Res., 2012

Enhanced mixed integer programming model for a transfer line design problem.
Comput. Ind. Eng., 2012

Applicability of optimal control theory to adaptive supply chain planning and scheduling.
Annu. Rev. Control., 2012

Balancing of simple assembly lines under variations of task processing times.
Ann. Oper. Res., 2012

Min-max and min-max (relative) regret approaches to representatives selection problem.
4OR, 2012

Two Dedicated Parallel Machines Scheduling Problem with Precedence Relations.
Proceedings of the Operations Research Proceedings 2012, 2012

A Stochastic Formulation of the Disassembly Line Balancing Problem.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

An Application of Goal Programming Technique for Reconfiguration of Transfer Lines.
Proceedings of the ICINCO 2012 - Proceedings of the 9th International Conference on Informatics in Control, Automation and Robotics, Volume 2, Rome, Italy, 28, 2012

Optimization in Design of Automated Machining Systems.
Proceedings of the ICINCO 2012 - Proceedings of the 9th International Conference on Informatics in Control, Automation and Robotics, Volume 1, Rome, Italy, 28, 2012

2011
On the complexity of the independent set problem in triangle graphs.
Discret. Math., 2011

The complexity of dissociation set problems in graphs.
Discret. Appl. Math., 2011

Multi-product lot-sizing and sequencing on a single imperfect machine.
Comput. Optim. Appl., 2011

2010
MIP-based GRASP and Genetic Algorithm for Balancing Transfer Lines.
Proceedings of the Matheuristics - Hybridizing Metaheuristics and Mathematical Programming, 2010

Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times.
Comput. Oper. Res., 2010

A MIP approach for balancing transfer line with complex industrial constraints.
Comput. Ind. Eng., 2010

Pricing strategies and models.
Annu. Rev. Control., 2010

Special section: Planning and control of manufacturing and logistic systems.
Annu. Rev. Control., 2010

2009
Machining Lines Automation.
Proceedings of the Springer Handbook of Automation, 2009

Forecasting demand for slow-moving items in case of reporting errors.
Risk Decis. Anal., 2009

Configuration des lignes d'usinage à boîtiers multibroches : une approche mixte.
RAIRO Oper. Res., 2009

An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem.
J. Heuristics, 2009

Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm.
Eur. J. Oper. Res., 2009

Branch and bound algorithm for a transfer line design problem: Stations with sequentially activated multi-spindle heads.
Eur. J. Oper. Res., 2009

Genetic algorithms for a supply management problem: MIP-recombination vs greedy decoder.
Eur. J. Oper. Res., 2009

Genetic algorithm for supply planning in two-level assembly systems with random lead times.
Eng. Appl. Artif. Intell., 2009

Balancing modular transfer lines with serial-parallel activation of spindle heads at stations.
Discret. Appl. Math., 2009

Minimizing makespan for multi-spindle head machines with a mobile table.
Comput. Oper. Res., 2009

MRP Offsetting for Assembly Systems with Random Component Delivery Times: A Particular Case.
Proceedings of the Advances in Production Management Systems. New Challenges, New Approaches, 2009

Balancing Mass Production Machining Lines with Genetic Algorithms.
Proceedings of the Advances in Production Management Systems. New Challenges, New Approaches, 2009

Qualitative Stability Analysis of an Optimal Balance for an Assembly Line with Fixed Stations Number.
Proceedings of 12th IEEE International Conference on Emerging Technologies and Factory Automation, 2009

2008
Optimisation de lignes de production. Partie II. Une approche multicritère.
J. Decis. Syst., 2008

Optimisation de lignes de production. Partie I. Cas monocritère.
J. Decis. Syst., 2008

Exact and heuristic algorithms for balancing transfer lines when a set of available spindle heads is given.
Int. Trans. Oper. Res., 2008

Extended beta-binomial model for demand forecasting of multiple slow-moving inventory items.
Int. J. Syst. Sci., 2008

A random search and backtracking procedure for transfer line balancing.
Int. J. Comput. Integr. Manuf., 2008

A stochastic model for operating room planning with elective and emergency demand for surgery.
Eur. J. Oper. Res., 2008

A heuristic multi-start decomposition approach for optimal design of serial machining lines.
Eur. J. Oper. Res., 2008

Optimisation of multi-position machines and transfer lines.
Eur. J. Oper. Res., 2008

On the performance of binomial and beta-binomial models of demand forecasting for multiple slow-moving inventory items.
Comput. Oper. Res., 2008

Emergent Chaotic Behaviour in Agent Based Manufacturing Systems.
Proceedings of the 17th IEEE International Workshops on Enabling Technologies: Infrastructures for Collaborative Enterprises, 2008

Lot-Sizing and Sequencing on a Single Imperfect Machine.
Proceedings of the Modelling, 2008

Planned lead times for one-level assembly system with service level constraint.
Proceedings of 13th IEEE International Conference on Emerging Technologies and Factory Automation, 2008

Control of chaos in agent based manufacturing systems.
Proceedings of 13th IEEE International Conference on Emerging Technologies and Factory Automation, 2008

2007
Optimization of power transmission systems using a multi-level decomposition approach.
RAIRO Oper. Res., 2007

HBBA: hybrid algorithm for buffer allocation in tandem production lines.
J. Intell. Manuf., 2007

Supply planning under uncertainties in MRP environments: A state of the art.
Annu. Rev. Control., 2007

Special section: Advances in manufacturing systems and logistics.
Annu. Rev. Control., 2007

2006
A Decomposition Method for Transfer Line Life Cycle Cost Optimisation.
J. Math. Model. Algorithms, 2006

Guest Editorial - Discrete Optimization Methods in Production and Logistics.
J. Math. Model. Algorithms, 2006

Stability analysis of an optimal balance for an assembly line with fixed cycle time.
Eur. J. Oper. Res., 2006

A special case of transfer lines balancing by graph approach.
Eur. J. Oper. Res., 2006

Balancing Assembly and Transfer Lines.
Eur. J. Oper. Res., 2006

Integer programming models for logical layout design of modular machining lines.
Comput. Ind. Eng., 2006

A Supply Planning Model for Multilevel Assembly Systems Under Random Lead Times.
Proceedings of 11th IEEE International Conference on Emerging Technologies and Factory Automation, 2006

Heuristic Methods to Solve the Alternative Subgraphs Assembly Line Balancing Problem.
Proceedings of the 2006 IEEE International Conference on Automation Science and Engineering, 2006

2005
A heuristic approach for transfer lines balancing.
J. Intell. Manuf., 2005

Editorial.
J. Intell. Manuf., 2005

A survey of the self-balancing production lines ("bucket brigades").
J. Intell. Manuf., 2005

Conception de systèmes de fabrication : prototype d'un logiciel d'aide à la décision.
J. Decis. Syst., 2005

Decomposition approach for a problem of lot-sizing and sequencing under uncertainties.
Int. J. Comput. Integr. Manuf., 2005

Machining lines with multi-spindle workstations: a new optimization problem.
Proceedings of 10th IEEE International Conference on Emerging Technologies and Factory Automation, 2005

Reconfigurable transfer lines cost optimization - a linear programming approach.
Proceedings of 10th IEEE International Conference on Emerging Technologies and Factory Automation, 2005

A combined heuristic approach for optimization of a class of machining lines.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2005

Organization of the modeling and simulation of the discrete processes.
Proceedings of the Information Processing and Security Systems., 2005

2004
Multiobjective optimization of robot motion for laser cutting applications.
Int. J. Comput. Integr. Manuf., 2004

2003
Une heuristique d'optimisation globale basée sur la <i>Ψ</i>-transformation.
RAIRO Oper. Res., 2003

2002
A Genetic Algorithm for the Allocation of Buffer Storage Capacities in a Production Line with Unreliable Machines.
J. Math. Model. Algorithms, 2002

State of art of optimization methods for assembly line design.
Annu. Rev. Control., 2002

2001
Guest editorial.
J. Intell. Manuf., 2001

Stability radius of the optimal assembly line balance with fixed cycle time.
Proceedings of 8th IEEE International Conference on Emerging Technologies and Factory Automation, 2001

Computer-aided programming of robotic manufacturing cells for laser cutting applications.
Proceedings of 8th IEEE International Conference on Emerging Technologies and Factory Automation, 2001

Optimization of Resource Allocation in Distributed Production Networks.
Proceedings of the From Theory to Practice in Multi-Agent Systems, 2001

2000
Queueing network models for a capacity allocation problem.
Proceedings of the 14<sup>th</sup> European Simulation Multiconference, 2000

1999
Models and methods of multicriteria optimization for computer-aided design of multi-unit mechanical transmission systems.
Proceedings of the 5th European Control Conference, 1999

1997
A stochastic method for discrete and continuous optimization in manufacturing systems.
J. Intell. Manuf., 1997


  Loading...