Andreas C. Nearchou

Orcid: 0000-0002-5525-8661

According to our database1, Andreas C. Nearchou authored at least 28 papers between 1997 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
An Empirical Analysis of a Set of Hybrid Heuristics for the Solution of the Resource Leveling Problem.
Oper. Res. Forum, March, 2024

The fuzzy human-robot collaboration assembly line balancing problem.
Comput. Ind. Eng., January, 2024

2022
Intelligent fleet management of autonomous vehicles for city logistics.
Appl. Intell., 2022

2021
Ship Routing Using Genetic Algorithms.
Oper. Res. Forum, 2021

The Fuzzy Assembly Line Worker Assignment and Balancing Problem.
Cybern. Syst., 2021

2018
Multicriteria scheduling optimization using an elitist multiobjective population heuristic: the h-NSDE algorithm.
J. Heuristics, 2018

2017
Assembly Line Balancing Using Differential Evolution Models.
Cybern. Syst., 2017

2016
Path Planning and scheduling for a fleet of autonomous vehicles.
Robotica, 2016

A population-based algorithm for the bi-objective assembly line worker assignment and balancing problem.
Eng. Appl. Artif. Intell., 2016

2014
A Genetic Algorithm for the Economic manpower Shift Planning Problem.
Cybern. Syst., 2014

2013
A Particle Swarm Optimization Algorithm for Scheduling Against Restrictive Common Due Dates.
Int. J. Comput. Intell. Syst., 2013

A meta-heuristic algorithm for the fuzzy assembly line balancing type-E problem.
Comput. Oper. Res., 2013

2012
Multi-objective fuzzy assembly line balancing using genetic algorithms.
J. Intell. Manuf., 2012

Multi-objective optimization with fuzzy measures and its application to flow-shop scheduling.
Eng. Appl. Artif. Intell., 2012

Integrating Path Planning, Routing, and Scheduling for Logistics Operations in manufacturing Facilities.
Cybern. Syst., 2012

A Hybrid Metaheuristic for the Single-Machine total Weighted tardiness Problem.
Cybern. Syst., 2012

2009
Vehicle scheduling in 2D shop floor environments.
Ind. Robot, 2009

2008
A differential evolution approach for the common due date early/tardy job scheduling problem.
Comput. Oper. Res., 2008

2006
Differential evolution for sequencing and scheduling optimization.
J. Heuristics, 2006

2004
Flow-shop sequencing using hybrid simulated annealing.
J. Intell. Manuf., 2004

A novel metaheuristic approach for the flow shop scheduling problem.
Eng. Appl. Artif. Intell., 2004

2002
An evolutionary algorithm for generating planar developments of arbitrarily curved surfaces.
Comput. Ind., 2002

1999
Reducing the Complexity of Robot's Scene for Faster Collision Detection.
J. Intell. Robotic Syst., 1999

A Genetic Navigation Algorithm for Autonomous Mobile Robots.
Cybern. Syst., 1999

Adaptive navigation of autonomous vehicles using evolutionary algorithms.
Artif. Intell. Eng., 1999

1998
Path planning of a mobile robot using genetic heuristics.
Robotica, 1998

Collision-Free Cartesian Trajectory Generation Using Raster Scanning and Genetic Algorithms.
J. Intell. Robotic Syst., 1998

1997
A genetic path planning algorithm for redundant articulated robots.
Robotica, 1997


  Loading...