George L. Vairaktarakis

Orcid: 0000-0001-7871-7990

According to our database1, George L. Vairaktarakis authored at least 25 papers between 1993 and 2020.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2020
A cutting plane approach for the multi-machine precedence-constrained scheduling problem.
Ann. Oper. Res., 2020

2017
Benchmark Schedules for Subcontracted Operations: Decentralization Inefficiencies that Arise from Competition and First-Come-First-Served Processing.
Decis. Sci., 2017

2013
Noncooperative Games for Subcontracting Operations.
Manuf. Serv. Oper. Manag., 2013

A Cooperative Savings Game Approach to a Time Sensitive Capacity Allocation and Scheduling Problem.
Decis. Sci., 2013

2012
Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs.
Oper. Res., 2012

2010
Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs.
Manuf. Serv. Oper. Manag., 2010

2009
NP-complete Problems and Proof Methodology.
Proceedings of the Encyclopedia of Optimization, Second Edition, 2009

2008
Forming partnerships in a virtual factory.
Ann. Oper. Res., 2008

2007
A Scheduling Problem with One Producer and the Bargaining Counterpart with Two Producers.
Proceedings of the Combinatorics, 2007

2005
Integrated Scheduling of Production and Distribution Operations.
Manag. Sci., 2005

Machine scheduling with deliveries to multiple customer locations.
Eur. J. Oper. Res., 2005

2004
Flexible Hybrid Flowshops.
Proceedings of the Handbook of Scheduling - Algorithms, Models, and Performance Analysis., 2004

The Master-Slave Scheduling Model.
Proceedings of the Handbook of Scheduling - Algorithms, Models, and Performance Analysis., 2004

2003
Simple Algorithms for Gilmore-Gomory's Traveling Salesman and Related Problems.
J. Sched., 2003

On Gilmore-Gomory's open question for the bottleneck TSP.
Oper. Res. Lett., 2003

The Value of Resource Flexibility in the Resource - Constrained Job Assignment Problem.
Manag. Sci., 2003

Complexity of Workforce Scheduling in Transfer Lines.
J. Glob. Optim., 2003

2002
Managerial Insights into the Effects of Interactions on Replacing Members of a Team.
Manag. Sci., 2002

Workforce planning in synchronous production systems.
Eur. J. Oper. Res., 2002

1999
Worker Cross-Training in Paced Assembly Lines.
Manuf. Serv. Oper. Manag., 1999

1997
Workforce Planning in Mixed Model Assembly Systems.
Oper. Res., 1997

Scheduling For Distributed Computing.
Proceedings of the 6th IEEE Workshop on Future Trends of Distributed Computer Systems (FTDCS '97), 1997

1996
The master-slave paradigm in parallel computer and industrial settings.
J. Glob. Optim., 1996

1994
Minimizing makespan in hybrid flowshops.
Oper. Res. Lett., 1994

1993
Test case generators and computational results for the maximum clique problem.
J. Glob. Optim., 1993


  Loading...