Xiaoqiang Cai

Orcid: 0000-0001-9829-5246

According to our database1, Xiaoqiang Cai authored at least 66 papers between 1998 and 2024.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Inventory replenishment decisions with uncertain price and demand.
Int. J. Prod. Res., April, 2024

Two-stage approximation allocation approach for real-time parking reservations considering stochastic requests and reusable resources.
Adv. Eng. Informatics, 2024

2023
Replenishment Policy with Limited Price Information.
Asia Pac. J. Oper. Res., June, 2023

2022
Cost Allocation for Less-Than-Truckload Collaboration via Shipper Consortium.
Transp. Sci., 2022

A loss matrix-based alternating optimization method for sparse PU learning.
Swarm Evol. Comput., 2022

Cost and emission allocation for joint replenishment systems subject to carbon constraints.
Comput. Ind. Eng., 2022

Evaluation on Integrating Relocation and User Flexibility in Large-Scale One-Way Electric Carsharing Systems.
Proceedings of the Intelligent Systems and Applications, 2022

2021
A General Theory of MultiArmed Bandit Processes with Constrained Arm Switches.
SIAM J. Control. Optim., 2021

Altruistic profit allocation rules for joint replenishment with carbon cap-and-trade policy.
Eur. J. Oper. Res., 2021

Two-stage matching-and-scheduling algorithm for real-time private parking-sharing programs.
Comput. Oper. Res., 2021

Revenue sharing for resource transfer among projects.
Comput. Oper. Res., 2021

An evolutionary multi-objective approach to learn from positive and unlabeled data.
Appl. Soft Comput., 2021

Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns.
Ann. Oper. Res., 2021

2020
Heterogeneous suppliers' contract design in assembly systems with asymmetric information.
Eur. J. Oper. Res., 2020

Optimal Purchasing Policy for Fresh Products from Multiple Supply Sources with Considerations of Random Delivery Times, Risk, and Information.
Decis. Sci., 2020

2019
Less-than-Truckload Shipper Collaboration in the Physical Internet.
Proceedings of the Intelligent Systems and Applications, 2019

2018
A General Framework of Multi-Armed Bandit Processes by Arm Switch Restrictions.
CoRR, 2018

2017
Coordinating a decentralized hybrid push-pull assembly system with unreliable supply and uncertain demand.
Ann. Oper. Res., 2017

2016
Cost allocation for less-than-truckload collaboration among perishable product retailers.
OR Spectr., 2016

On Core Sorting in RMTS and RMTO Systems: A Newsvendor Framework.
Decis. Sci., 2016

Trade credit insurance, capital constraint, and the behavior of manufacturers and banks.
Ann. Oper. Res., 2016

Heuristic approach on dynamic lot-sizing model for durable products with end-of-use constraints.
Ann. Oper. Res., 2016

2015
Remanufacturing and pricing decisions with random yield and random demand.
Comput. Oper. Res., 2015

2014
Optimal acquisition and production policy in a hybrid manufacturing/remanufacturing system with core acquisition at different quality levels.
Eur. J. Oper. Res., 2014

Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance.
Comput. Oper. Res., 2014

Design and Implementation of Network Hard Disk.
Proceedings of the Algorithms and Architectures for Parallel Processing, 2014

2013
Double marginalization and coordination in the supply chain with uncertain supply.
Eur. J. Oper. Res., 2013

A dynamic branch and bound approach for robotic rescheduling with randomly arriving jobs.
Proceedings of 10th IEEE International Conference on Networking, Sensing and Control, 2013

2012
Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs.
Oper. Res., 2012

2011
Nonlinear Programming Model Integrating Different Preference Structures.
IEEE Trans. Syst. Man Cybern. Part A, 2011

Scheduling deteriorating jobs on a single machine subject to breakdowns.
J. Sched., 2011

Group consensus algorithms based on preference relations.
Inf. Sci., 2011

Algorithms for estimating missing elements of incomplete intuitionistic preference relations.
Int. J. Intell. Syst., 2011

On a multi-period supply chain system with supplementary order opportunity.
Eur. J. Oper. Res., 2011

2010
Nonlinear optimization models for multiple attribute group decision making with intuitionistic fuzzy information.
Int. J. Intell. Syst., 2010

Recent advances in intuitionistic fuzzy information aggregation.
Fuzzy Optim. Decis. Mak., 2010

Optimal Solution Structure for Multi-Period Production Planning with Returned Products remanufacturing.
Asia Pac. J. Oper. Res., 2010

Optimal manpower Planning Decision with Single Employee Type Considering Minimal Employment Period Constraint.
Asia Pac. J. Oper. Res., 2010

2009
Stochastic scheduling on parallel machines to minimize discounted holding costs.
J. Sched., 2009

Stochastic Scheduling Subject to Preemptive-Repeat Breakdowns with Incomplete Information.
Oper. Res., 2009

Incomplete interval-valued intuitionistic fuzzy preference relations.
Int. J. Gen. Syst., 2009

A new decentralized approach for the lot sizing problem of durable products with demand substitution.
Proceedings of the 7th IEEE International Conference on Industrial Informatics, 2009

2007
Single-machine scheduling with general costs under compound-type distributions.
J. Sched., 2007

An integrated staff-sizing approach considering feasibility of scheduling decision.
Ann. Oper. Res., 2007

Optimal Commodity Distribution for a Vehicle with Fixed Capacity Under Vendor Managed Inventory.
Proceedings of the Combinatorics, 2007

A Scheduling Problem with One Producer and the Bargaining Counterpart with Two Producers.
Proceedings of the Combinatorics, 2007

2006
Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution.
OR Spectr., 2006

The Order Strategies for Competitive Retailers under the Group Buying Auction.
Proceedings of the IEEE International Conference on Systems, 2006

Maximizing Dual Function by Genetic Algorithm - A New Approach for Optimal Manpower Planning.
Proceedings of the Computational Intelligence, 2006

An Optimization Problem on Two-Partition of Jobs for Profit Allocation.
Proceedings of the IEEE Asia Pacific Conference on Circuits and Systems 2006, 2006

2005
Dynamically optimal policies for stochastic scheduling subject to preemptive-repeat machine breakdowns.
IEEE Trans Autom. Sci. Eng., 2005

Minimizing Completion Time Variance with Compressible Processing Times.
J. Glob. Optim., 2005

Single-Machine Scheduling with Exponential Processing Times and General Stochastic Cost Functions.
J. Glob. Optim., 2005

Preface.
Ann. Oper. Res., 2005

Optimal Manpower Planning with Temporal Labor and Contract Period Constraints.
Proceedings of the Algorithmic Applications in Management, First International Conference, 2005

2004
Stochastic Scheduling with Earliness and Tardiness Penalties.
Proceedings of the Handbook of Scheduling - Algorithms, Models, and Performance Analysis., 2004

Minimax portfolio optimization: empirical numerical study.
J. Oper. Res. Soc., 2004

Optimization of tandem queue systems with finite buffers.
Comput. Oper. Res., 2004

Optimal production decisions under an uncertain deadline.
Proceedings of the IEEE International Conference on Systems, 2004

2003
Complexity of Workforce Scheduling in Transfer Lines.
J. Glob. Optim., 2003

2002
Workforce planning in synchronous production systems.
Eur. J. Oper. Res., 2002

2001
Time-varying minimum cost flow problems.
Eur. J. Oper. Res., 2001

2000
Multiprocessor task scheduling to minimize the maximum tardiness and the total completion time.
IEEE Trans. Robotics Autom., 2000

Linear time-approximation algorithms for bin packing.
Oper. Res. Lett., 2000

Asymmetric Earliness and Tardiness Scheduling with Exponential Processing Times on an Unreliable Machine.
Ann. Oper. Res., 2000

1998
Multi-machine Scheduling with Variance Minimization.
Discret. Appl. Math., 1998


  Loading...