Jinlong Liang
According to our database1,
Jinlong Liang authored at least 8 papers
between 2009 and 2025.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2025
Performance Degradation Analysis-Based Fatigue Reliability Modeling and Assessment for Offshore Wind Turbine Blade Adhesive Bonding.
IEEE Trans. Reliab., December, 2025
Fatigue Life Prediction and Reliability Assessment of Cracked CFRP Laminates in WTBs Application: A Combined Approach Using Paris-XFEM and ALK Techniques.
IEEE Trans. Reliab., December, 2025
A developed Fick's law and HSV-based fatigue reliability modeling method for CFRP/Epoxy adhesive structures considering environmental stresses and size effects.
Reliab. Eng. Syst. Saf., 2025
A Multi-Scale Geographically Weighted Regression Approach to Understanding Community-Built Environment Determinants of Cardiovascular Disease: Evidence from Nanning, China.
ISPRS Int. J. Geo Inf., 2025
2024
CCZM-based fatigue analysis and reliability assessment for wind turbine blade adhesive joints considering parameter uncertainties.
Qual. Reliab. Eng. Int., October, 2024
2023
A fatigue reliability assessment approach for wind turbine blades based on continuous time Bayesian network and FEA.
Qual. Reliab. Eng. Int., July, 2023
2020
IEEE Access, 2020
2009
Hybrid multi-robot path planning strategy based on RRT and fuzzy control in wireless sensor network.
Proceedings of the IEEE International Conference on Robotics and Biomimetics, 2009