Johannes Hatzl

Orcid: 0000-0002-3152-7791

According to our database1, Johannes Hatzl authored at least 18 papers between 2005 and 2023.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Recurrent neural networks for generalization towards the vessel geometry in autonomous endovascular guidewire navigation in the aortic arch.
Int. J. Comput. Assist. Radiol. Surg., September, 2023

2022
Mixed-Reality-Assisted Puncture of the Common Femoral Artery in a Phantom Model.
J. Imaging, 2022

Learning-based autonomous vascular guidewire navigation without human demonstration in the venous system of a porcine liver.
Int. J. Comput. Assist. Radiol. Surg., 2022

2012
2-balanced flows and the inverse 1-median problem in the Chebyshev space.
Discret. Optim., 2012

2011
Maximizing a Sum Related to Image Segmentation Evaluation.
J. Math. Model. Algorithms, 2011

2010
A combinatorial algorithm for the 1-median problem in R<sup>d</sup> with the Chebyshev norm.
Oper. Res. Lett., 2010

Median problems with positive and negative weights on cycles and cacti.
J. Comb. Optim., 2010

The 1-Median Problem in R<sup>d</sup> with the Chebyshev-Norm and its Inverse Problem.
Electron. Notes Discret. Math., 2010

clever or smart: Strategies for the online target date assignment problem.
Discret. Appl. Math., 2010

The Inverse 1-Median Problem in Rd with the Chebyshev-Norm.
Proceedings of the 9th Cologne-Twente Workshop on Graphs and Combinatorial Optimization, 2010

2009
How hard is it to find extreme Nash equilibria in network congestion games?
Theor. Comput. Sci., 2009

2008
Combinatorial properties of a general domination problem with parity constraints.
Discret. Math., 2008

Reverse 2-median problem on trees.
Discret. Appl. Math., 2008

A parity domination problem in graphs with bounded treewidth and distance-hereditary graphs.
Computing, 2008

2007
Median problems on wheels and cactus graphs.
Computing, 2007

2006
A linear time algorithm for the reverse 1-median problem on a cycle.
Networks, 2006

A complex time based construction heuristic for batch scheduling problems in the chemical industry.
Eur. J. Oper. Res., 2006

2005
Review, extensions and computational comparison of MILP formulations for scheduling of batch processes.
Comput. Chem. Eng., 2005


  Loading...