Mike Tao Zhang

According to our database1, Mike Tao Zhang authored at least 23 papers between 2000 and 2013.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2013
Editorial: Automation in green manufacturing.
IEEE Trans Autom. Sci. Eng., 2013

2008
Steady-State Throughput and Scheduling Analysis of Multicluster Tools: A Decomposition Approach.
IEEE Trans Autom. Sci. Eng., 2008

2007
Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing.
IEEE Trans Autom. Sci. Eng., 2007

Editorial e-Manufacturing in the Semiconductor Industry.
IEEE Trans Autom. Sci. Eng., 2007

Bottleneck Station Scheduling in Semiconductor Assembly and Test Manufacturing Using Ant Colony Optimization.
IEEE Trans Autom. Sci. Eng., 2007

Queueing Theory for Semiconductor Manufacturing Systems: A Survey and Open Problems.
IEEE Trans Autom. Sci. Eng., 2007

Designing robot grippers: optimal edge contacts for part alignment.
Robotica, 2007

Scheduling Analysis of Cluster Tools with Buffer/Process Modules.
Proceedings of the 2007 IEEE International Conference on Robotics and Automation, 2007

Calibration of Wafer Handling Robots: A Fixturing Approach.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2007

Throughput Analysis of Linear Cluster Tools.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2007

2006
E-manufacturing in the semiconductor industry.
IEEE Robotics Autom. Mag., 2006

Multi-factory capacity planning in semiconductor assembly and test manufacturing with multiple-chip products.
Proceedings of the 2006 IEEE International Conference on Automation Science and Engineering, 2006

Performance Evaluation and Schedule Optimization of Multi-Cluster Tools with Process Times Uncertainty.
Proceedings of the 2006 IEEE International Conference on Automation Science and Engineering, 2006

2005
Fixture-based industrial robot calibration for silicon wafer handling.
Ind. Robot, 2005

Production planning with joint resources usage semiconductor test manufacturing.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2005

Multi-factory optimization enables kit reconfiguration in semiconductor manufacturing.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2005

Dynamic capacity modeling with multiple re-entrant workflows in semiconductor assembly manufacturing.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2005

2004
A Computer-Aided Design Tool in Java for Planar Gripper Design.
J. Comput. Inf. Sci. Eng., 2004

2002
Gripper point contacts for part alignment.
IEEE Trans. Robotics Autom., 2002

2001
Pin design for part feeding.
Robotica, 2001

Shape tolerance for robot gripper jaws.
Proceedings of the IEEE/RSJ International Conference on Intelligent Robots and Systems, 2001

Design of Robot Gripper Jaws based on Trapezoidal Modules.
Proceedings of the 2001 IEEE International Conference on Robotics and Automation, 2001

2000
The Toppling Graph: Designing Pin Sequences for Part Feeding.
Proceedings of the 2000 IEEE International Conference on Robotics and Automation, 2000


  Loading...