Seyyed M. T. Fatemi Ghomi

Orcid: 0000-0003-4363-994X

Affiliations:
  • Amirkabir University of Technology


According to our database1, Seyyed M. T. Fatemi Ghomi authored at least 101 papers between 1999 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
Separate and bundling selling strategies for complementary products in a participative pricing mechanism.
Comput. Ind. Eng., March, 2023

2022
Deep learning for Alzheimer's disease diagnosis: A survey.
Artif. Intell. Medicine, 2022

2021
Multi-objective multi-factory scheduling.
RAIRO Oper. Res., 2021

Heuristic analyses of separate and bundling sales for complimentary products under consignment stock policy.
Comput. Ind. Eng., 2021

A Multi-objective Particle Swarm Optimization Based on Pareto Archive for Integrated Production and Distribution Planning in A Green Supply Chain.
Appl. Artif. Intell., 2021

2020
Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming.
Soft Comput., 2020

Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics.
Eur. J. Oper. Res., 2020

Joint cell formation, cell scheduling, and group layout problem in virtual and classical cellular manufacturing systems.
Appl. Soft Comput., 2020

2019
Development of fitted line and fitted cosine curve for recognition and analysis of unnatural patterns in process control charts.
Pattern Anal. Appl., 2019

An intelligent truck scheduling and transportation planning optimization model for product portfolio in a cross-dock.
J. Intell. Manuf., 2019

Integrated multi-factory production and distribution scheduling applying vehicle routing approach.
Int. J. Prod. Res., 2019

Network configuration multi-factory scheduling with batch delivery: A learning-oriented simulated annealing approach.
Comput. Ind. Eng., 2019

2018
Modeling and measuring the structural complexity in assembly supply chain networks.
J. Intell. Manuf., 2018

Hybrid simulated annealing and genetic approach for solving a multi-stage production planning with sequence-dependent setups in a closed-loop supply chain.
Appl. Soft Comput., 2018

2017
A control theoretical modelling for velocity tuning of the conveyor belt in a dynamic mixed-model assembly line.
Int. J. Prod. Res., 2017

Heuristic approaches for mixed-model sequencing problem with stochastic processing times.
Int. J. Prod. Res., 2017

Vendor managed inventory with consignment stock for supply chain with stock- and price-dependent demand.
Int. J. Prod. Res., 2017

A Markovian approach for multi-level multi-product multi-period capacitated lot-sizing problem with uncertainty in levels.
Int. J. Prod. Res., 2017

Multi-stage multi-product multi-period production planning with sequence-dependent setups in closed-loop supply chain.
Comput. Ind. Eng., 2017

Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions.
Ann. Oper. Res., 2017

Stochastic programming via scenario planning for system reliability optimization.
Proceedings of the 2nd International Conference on System Reliability and Safety, 2017

2016
A survey of multi-factory scheduling.
J. Intell. Manuf., 2016

A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem.
J. Comput. Appl. Math., 2016

Cross dock scheduling with fixed outbound trucks departure times under substitution condition.
Comput. Ind. Eng., 2016

2015
A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration.
Int. J. Syst. Sci., 2015

Flexible supply chain optimization with controllable lead time and shipping option.
Appl. Soft Comput., 2015

Minimizing cost-related objective in synchronous scheduling of parallel factories in the virtual production network.
Appl. Soft Comput., 2015

Acceleration strategies of Benders decomposition for the security constraints power system expansion planning.
Ann. Oper. Res., 2015

2014
Applying FARSJUM intelligent system to derive priorities in sparse hierarchical problems.
Soft Comput., 2014

Economic Design of Exponentially Weighted Moving Average Control Chart Based on Measurement Error Using Genetic Algorithm.
Qual. Reliab. Eng. Int., 2014

A new hybrid evolutionary based RBF networks method for forecasting time series: A case study of forecasting emergency supply demand time series.
Eng. Appl. Artif. Intell., 2014

Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs.
Comput. Oper. Res., 2014

Vehicle routing scheduling problem with cross docking and split deliveries.
Comput. Chem. Eng., 2014

Integrated scheduling of production and rail transportation.
Comput. Ind. Eng., 2014

Multi-objective fuzzy multiprocessor flowshop scheduling.
Appl. Soft Comput., 2014

2013
Fuzzy hypothesis testing with vague data using likelihood ratio test.
Soft Comput., 2013

Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness.
Math. Comput. Model., 2013

A Benders decomposition algorithm for a multi-area, multi-stage integrated resource planning in power systems.
J. Oper. Res. Soc., 2013

A two-stage hybrid flowshop scheduling problem in machine breakdown condition.
J. Intell. Manuf., 2013

The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine.
Inf. Sci., 2013

A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes.
Fuzzy Sets Syst., 2013

Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times.
Comput. Oper. Res., 2013

2012
Incorporating transportation time in multi-agent production network scheduling.
Int. J. Comput. Integr. Manuf., 2012

Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system, simulated annealing and variable neighbourhood search.
Expert Syst. J. Knowl. Eng., 2012

Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GA.
Eng. Appl. Artif. Intell., 2012

Multi-objective supply planning for two-level assembly systems with stochastic lead times.
Comput. Oper. Res., 2012

Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines.
Appl. Soft Comput., 2012

Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm.
Appl. Soft Comput., 2012

Multi-mode renewable resource-constrained allocation in PERT networks.
Appl. Soft Comput., 2012

Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration.
Adv. Eng. Softw., 2012

2011
Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique.
Soft Comput., 2011

Fuzzy development of Mean and Range control charts using statistical properties of different representative values.
J. Intell. Fuzzy Syst., 2011

Scheduling open shops with parallel machines to minimize total completion time.
J. Comput. Appl. Math., 2011

Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost.
Int. J. Syst. Sci., 2011

A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups.
Int. J. Comput. Integr. Manuf., 2011

Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem.
Expert Syst. Appl., 2011

Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups.
Expert Syst. Appl., 2011

Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage.
Expert Syst. Appl., 2011

Corrigendum to: "Genetic algorithm for supply planning in two-level assembly systems with random lead times" [Engineering Applications of Artificial Intelligence 22 (2009) 906-915].
Eng. Appl. Artif. Intell., 2011

A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain.
Comput. Math. Appl., 2011

Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan.
Appl. Soft Comput., 2011

Recognition of unnatural patterns in process control charts through combining two types of neural networks.
Appl. Soft Comput., 2011

Multi-objective genetic-based algorithms for a cross-docking scheduling problem.
Appl. Soft Comput., 2011

A new approach in supply chain modeling.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

Service impact on customer demand and member profit in a supply chain.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

Multi-objective assembly line balancing problem with bounded processing times, learning effect, and sequence-dependent setup times.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

Hybrid solving algorithm for complex machine scheduling problem.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

2010
Earliness-tardiness-lost sales dynamic job-shop scheduling.
Prod. Eng., 2010

Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups.
J. Intell. Manuf., 2010

Development of a PSO-SA hybrid metaheuristic for a new comprehensive regression model to time-series forecasting.
Expert Syst. Appl., 2010

A contribution and new heuristics for open shop scheduling.
Comput. Oper. Res., 2010

Group shops scheduling with makespan criterion subject to random release dates and processing times.
Comput. Oper. Res., 2010

A high performing metaheuristic for job shop scheduling with sequence-dependent setup times.
Appl. Soft Comput., 2010

A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks.
Adv. Eng. Softw., 2010

An electromagnetism-like metaheuristic for sequence dependent open shop scheduling.
Proceedings of the Fifth International Conference on Bio-Inspired Computing: Theories and Applications, 2010

A bi-objective case of no-wait flowshops.
Proceedings of the Fifth International Conference on Bio-Inspired Computing: Theories and Applications, 2010

2009
A note on minimizing makespan on a single batch processing machine with nonidentical job sizes.
Theor. Comput. Sci., 2009

A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling.
J. Intell. Manuf., 2009

An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages.
Int. J. Syst. Sci., 2009

Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm.
Expert Syst. Appl., 2009

A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic.
Expert Syst. Appl., 2009

2008
Lower bound for the mean project completion time in dynamic PERT networks.
Eur. J. Oper. Res., 2008

2007
A hybrid system for multiobjective problems - A case study in NP-hard problems.
Knowl. Based Syst., 2007

Farsjum, a Fuzzy System for Ranking Sparse Judgment Matrices: a Case Study in Soccer tournaments.
Int. J. Uncertain. Fuzziness Knowl. Based Syst., 2007

A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept.
Eur. J. Oper. Res., 2007

Meta knowledge of intelligent manufacturing: An overview of state-of-the-art.
Appl. Soft Comput., 2007

Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines.
Appl. Math. Comput., 2007

Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon.
Appl. Math. Comput., 2007

Supply Chain Operations Planning with Setup Times and Multi Period Capacity Consumption.
Proceedings of the Advances in Production Management Systems, 2007

2006
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over.
J. Oper. Res. Soc., 2006

A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains.
Eur. J. Oper. Res., 2006

A hybrid intelligent system for multiobjective decision making problems.
Comput. Ind. Eng., 2006

Developing a heuristic algorithm for order production planning using network models under uncertainty conditions.
Appl. Math. Comput., 2006

An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times.
Appl. Math. Comput., 2006

2005
A hybrid systematic design for multiobjective market problems: a case study in crude oil markets.
Eng. Appl. Artif. Intell., 2005

A Fuzzy System for Multiobjective Problems.
Proceedings of the Artificial Intelligence Applications and Innovations - IFIP TC12 WG12.5, 2005

2004
An Empirical Research in Intelligent Manufacturing: A Frame Based Representation of AI Usages in Manufacturing Aspects.
Proceedings of the Emerging Solutions for Future Manufacturing Systems, 2004

2003
A new structural mechanism for reducibility of stochastic PERT networks.
Eur. J. Oper. Res., 2003

Optimal control of service rates and arrivals in Jackson networks.
Eur. J. Oper. Res., 2003

2002
Path critical index and activity critical index in PERT networks.
Eur. J. Oper. Res., 2002

1999
A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network.
Eur. J. Oper. Res., 1999


  Loading...