Shaojun Lu
Orcid: 0000-0001-9195-4376
According to our database1,
Shaojun Lu
authored at least 18 papers
between 2018 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Data-driven robust optimization of dual-channel closed-loop supply chain network design considering uncertain demand and carbon cap-and-trade policy.
Comput. Ind. Eng., January, 2024
2023
Integrated optimization of production scheduling and maintenance planning with dynamic job arrivals and mold constraints.
Comput. Ind. Eng., December, 2023
Ann. Math. Artif. Intell., June, 2023
Modified benders decomposition and metaheuristics for multi-machine parallel-batch scheduling and resource allocation under deterioration effect.
Comput. Ind. Eng., February, 2023
Preemptive multi-skill resource-constrained project scheduling of marine power equipment maintenance tasks.
J. Intell. Fuzzy Syst., 2023
Optimal pricing and supply strategy for vertically integrated manufacturers with customer preference and market spillover.
Comput. Ind. Eng., 2023
2022
A hybrid metaheuristic for a semiconductor production scheduling problem with deterioration effect and resource constraints.
Oper. Res., 2022
Solving a stochastic hierarchical scheduling problem by VNS-based metaheuristic with locally assisted algorithms.
Appl. Soft Comput., 2022
2021
Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines.
Optim. Lett., 2021
A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities.
J. Comput. Appl. Math., 2021
Energy-efficient rescheduling with time-of-use energy cost: Application of variable neighborhood search algorithm.
Comput. Ind. Eng., 2021
A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem.
Appl. Soft Comput., 2021
2020
Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing.
J. Sched., 2020
Robust parallel-batching scheduling with fuzzy deteriorating processing time and variable delivery time in smart manufacturing.
Fuzzy Optim. Decis. Mak., 2020
2018
Single-Machine and Parallel-Machine Parallel-Batching Scheduling Considering Deteriorating Jobs, Various Group, and Time-Dependent Setup Time.
Informatica, 2018
A hybrid VNS-HS algorithm for a supply chain scheduling problem with deteriorating jobs.
Int. J. Prod. Res., 2018
A hybrid ABC-TS algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity.
Appl. Soft Comput., 2018